My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 2:51:21 PM
Creation date
5/15/2019 9:33:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
^ tb <br /> STATE OF CALIFORNIA <br /> i <br /> STATE WATER RESOURCES CONTROL BOARD <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT RIS CHANGE OF INFORMATION ❑ 7 PERMANENTL O SI <br /> ONE ITEM ❑ 2 INTERIM PERMIT ❑ d AMENDED PERMIT a 6 TEMPORARY TANK CLOSURE ❑ 8 TANK RE VED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN 11 <br /> A. OWNER'S TANK 1.D.# B. MANUFACTURED BY: e4 <br /> C. DATE INSTALLED(MO/DAY/YEAR) / D. TANK CAPACITY IN GALLONS: <br /> ILTANKCO ENTS IFA-1 ISMARKEO,COMPLETE ITEM C. <br /> A. 1 MOTOR VEHICLE FUEL ❑ 4 OIL B, C 1a REGULAR 3 DIESEL C 6 AVIATIONGAS <br /> F7 UNLEADED ASAHOL <br /> GA2 PETROLEUM ❑ 00 EMPTY �RODUCT ❑ 1bREMIUUNLEADED 5 JET FUEL ❑ 7 METHANOL <br /> ❑ 3 CHEMICALPROOUCT ❑ 95 UNKNOWN ❑ 2 WASTE ❑ 2 LEADED 99 OTHER (DESCRIBE IN ITEM M BELOW) <br /> D. IF(A.D ISNOTMARKED, ENTER NAME OFSUBSTANCE STORED C.A.S.4: <br /> III. TANK CONSTRU ON MARK ONE ITEM ONLY IN BOXES A,S.AND C,AND ALL THAT APPLIES IN BOX D AND <br /> A. TYPE OF 2r 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM ❑ 2 SINGLE WALL ❑ < SECONDARY CONTAINMENT (VAULTEDTANK) ❑ 99 OTHER <br /> B. TANK ❑ 1 BARE STEEL ❑ 2 STAINLESS STEEL u 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (PHmwyTank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ d PHENOLIC LINING <br /> C.INTERIOR <br /> � <br /> ❑ 5 GLASS LINING �UNLINED ❑ 96 UNKNOWN ❑ 99 OTHER <br /> LINIS UNING MATERIAL COMPATIBLE WITH 10D%METHANOL? YES_ NO_ <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP Cj2�4_FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE 95 UNKNOWN E�] 99 OTHER <br /> E SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND.BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A 2 WE A U 3 GRAVITY A U 99 OTHER <br /> S. CONSTRUCTION A U I SINGLE WALL A 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U N OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A 0d FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING ❑ 3 MONRORBIG ❑99 OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITO <br /> � RING <br /> ❑ 6 TANK TESTING L�7 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ N OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE LAST USED(MOIOAY/YR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH <br /> SUBSTANCE REMAINING GALLONS INERTMATERIAL? YES ❑ NO ❑ <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAMEGATE <br /> (PRINTED A SIGNANRID <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW eZ <br /> STATE LD.# <br /> COUNTY# JURISDICTION# FACILITY# TANK# °J <br /> 3 I i 1 / II <br /> PERMIT NUMBER PERMIT APPROVED BYIDATE PERMIT EXPIRATION OATS <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION-FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. 1 <br /> FILE THIS FORM WITH THS'OCAL AGENCY IMPLEMENTING THE UNDERGROUND STP'--STANK REGULATIONS <br /> FORM 8 (12-91) <br /> w9oauBRc <br />
The URL can be used to link to this page
Your browser does not support the video tag.