My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
INSTALL 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2019 11:34:29 AM
Creation date
5/15/2019 11:02:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2003
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARCHITECTURE • ENGINEERING • ENVIRONMENTAL SERVICES <br /> IfHL <br /> ROUP INC. 1340 Arnold Drive, Suite I10, Martinez, CA 94553 Telephone: (925) 313-9700 Facsimile: (925) 313-9709 <br /> John W.Johnson RECem <br /> Co-President JA N 2 6 2004 <br /> Architect <br /> January 22, 2004 ENVIRONMENT HEALTH <br /> Brian E Zita PERMIT/SERVICES <br /> Co-President Ms. Michelle Le <br /> Architect San Joaquin County <br /> Environmental Health Department <br /> 304 East Weber Avenue,Third Floor <br /> John B. Hicks Stockton, CA 95202 <br /> Vice President <br /> Cecil R. Spencer RE: Safeway Fueling Center#2707 <br /> Vice President 6425 N. Pacific Avenue <br /> Stockton, California <br /> Revise Phase 1 Equipment from Phil-Tite System(CARE E.O.VR-101-C) to <br /> Regional Managers the newly approved CNI System (CARE E.O. VR-104-A) <br /> Jesse E. Macias <br /> Roy W Pedro Dear Ms.Le: <br /> Alan K Shimabukuro <br /> John W. Strobel We are writing this letter to inform you that our client, Safeway hlc.,requested we revise <br /> Blythe R.Wilson the previously approved permit because they are changing the Phase I Equipment from the <br /> Phil-Tite System to the CNI System. <br /> Therefore,we have enclosed the revised sheet FS2 (Equipment Schedule)that contain the <br /> changes together with a set of cut sheets for your use and reference. <br /> Please call us if you have any questions or need additional information. <br /> Respectfully, <br /> RHL DESIGN GROUP,INC. <br /> Offices � <br /> uZ e S <br /> ANAHEIM, CA JO Capt <br /> BELLEVUE,WA <br /> CAMAS, WA cc: Todd Paradis—Safeway Inc. <br /> MARTINEZ, CA Kent Miller—City of Stockton Fire Dept. <br /> PETALUMA, CA <br /> ROSEVILLE, CA <br /> SCOTTSDALE, AZ <br /> wurw.rhldesign.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.