Laserfiche WebLink
UST SYSTEM DRAWING INFORMATION <br /> 1. X Three complete sets of plans(include manufacturer's specification sheets for proposed equipment to be <br /> installed). <br /> 2. _X_ Plans drawn to scale in non-erasable print. <br /> 3. X Plot plan to show location of tanks and all associated piping. <br /> 4. X Striker plates or drop tube-mounted bottom protectors illustrated below all accessible openings. <br /> 5. X Tank cross-sectional diagram. <br /> 6. X Detail of tank,associated piping,excavation and cover. <br /> 7. _ X__, Tank(s)and piping approved by a nationally recognized independent testing organization. [Title 23,Chapter 16, <br /> Article 3,Section 2631 (b)&2635] <br /> 8. _�(_ Verification of product compatibility with the tank(s), piping,monitoring <br /> device(s),epoxy or silicone glues,etc. <br /> 9. X Manufacturer's written installation instructions for tank(s),piping,monitoring devices,etc. <br /> 10. X At the installation site,prior to installation,a tightness test shall be performed on both primary(10)and secondary <br /> (20)containment systems before covering. [Section 2635(a)(3)&(4)] <br /> 11. ....�( Tank integrity test required upon completion of installation with tank in operating condition. Test results to be <br /> submitted directly to EHD from the testing company or owner of facility. [Health&Safety Code.Division 20. <br /> Chapter 6.7,Section 25291 (h)] <br /> 12. TANK COMPOSITION <br /> TANK# 1 2 <br /> CAPACITY 20,000 GAL. 20,000 GAL. <br /> MOD RN MO <br /> MANUFACTURFR WELDING WELDING <br /> STEEL STEEL <br /> COMPOSITION FIBERGLASS FIBERGLASS <br /> GLASTEEL GLASTEEL <br /> REGULAR PREMIUM UNLEADED/ <br /> PRODUCT UNLEADED DIFSFI <br /> CORROSION FRP FRP <br /> PROTECTION <br /> 111 IIBTF7n YES YES <br /> COMPATIBILITY YES YES <br /> WITH t00% <br /> MPTHANQL <br /> 13. TANK(s)TO BE INSTALLED <br /> A. Steel-clad with fiberglass reinforced plastic coatings,composites,or equivalent non-metallic exterior <br /> coatings or coverings. <br /> (1) Tested at the installation site using an electric resistance holiday detector. <br /> (2) Vacuum applied to interstitial space. <br /> e. Fiberglass <br /> __...._._._. <br /> (1) Installation instructions require an air test and soap bubble test prior to installation. <br /> (2) Vacuum applied to interstitial space. <br /> (3) Hydrostatic annular(primary tank pressure test). <br />