My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
INSTALL 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2019 11:34:29 AM
Creation date
5/15/2019 11:02:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2003
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM DRAWING INFORMATION <br /> 1. X Three complete sets of plans(include manufacturer's specification sheets for proposed equipment to be <br /> installed). <br /> 2. _X_ Plans drawn to scale in non-erasable print. <br /> 3. X Plot plan to show location of tanks and all associated piping. <br /> 4. X Striker plates or drop tube-mounted bottom protectors illustrated below all accessible openings. <br /> 5. X Tank cross-sectional diagram. <br /> 6. X Detail of tank,associated piping,excavation and cover. <br /> 7. _ X__, Tank(s)and piping approved by a nationally recognized independent testing organization. [Title 23,Chapter 16, <br /> Article 3,Section 2631 (b)&2635] <br /> 8. _�(_ Verification of product compatibility with the tank(s), piping,monitoring <br /> device(s),epoxy or silicone glues,etc. <br /> 9. X Manufacturer's written installation instructions for tank(s),piping,monitoring devices,etc. <br /> 10. X At the installation site,prior to installation,a tightness test shall be performed on both primary(10)and secondary <br /> (20)containment systems before covering. [Section 2635(a)(3)&(4)] <br /> 11. ....�( Tank integrity test required upon completion of installation with tank in operating condition. Test results to be <br /> submitted directly to EHD from the testing company or owner of facility. [Health&Safety Code.Division 20. <br /> Chapter 6.7,Section 25291 (h)] <br /> 12. TANK COMPOSITION <br /> TANK# 1 2 <br /> CAPACITY 20,000 GAL. 20,000 GAL. <br /> MOD RN MO <br /> MANUFACTURFR WELDING WELDING <br /> STEEL STEEL <br /> COMPOSITION FIBERGLASS FIBERGLASS <br /> GLASTEEL GLASTEEL <br /> REGULAR PREMIUM UNLEADED/ <br /> PRODUCT UNLEADED DIFSFI <br /> CORROSION FRP FRP <br /> PROTECTION <br /> 111 IIBTF7n YES YES <br /> COMPATIBILITY YES YES <br /> WITH t00% <br /> MPTHANQL <br /> 13. TANK(s)TO BE INSTALLED <br /> A. Steel-clad with fiberglass reinforced plastic coatings,composites,or equivalent non-metallic exterior <br /> coatings or coverings. <br /> (1) Tested at the installation site using an electric resistance holiday detector. <br /> (2) Vacuum applied to interstitial space. <br /> e. Fiberglass <br /> __...._._._. <br /> (1) Installation instructions require an air test and soap bubble test prior to installation. <br /> (2) Vacuum applied to interstitial space. <br /> (3) Hydrostatic annular(primary tank pressure test). <br />
The URL can be used to link to this page
Your browser does not support the video tag.