Project No. JB -314 <br />24 March 2003 <br />Page 14 <br />6.8 Miscellaneous <br />Our exploration did not reveal the presence of buried items such as leaching <br />fields, wells, storage tanks, etc other than previously discussed. It is possible, <br />however, that such items may be present. If such items are encountered during <br />grading or during excavations of foundations, our firm should be notified <br />immediately to provide recommendations for proper procedures. Also, this study <br />did not include investigations for toxic substances or groundwater contamination <br />of any type. If such conditions are encountered during site development, <br />additional studies will be required. <br />6.9 Plan Review <br />Before submitting design drawings and construction documents to the appropriate <br />local agency for approval, copies of the documents should be reviewed by our <br />firm to ensure that the recommendations in this report have been effectively <br />incorporated. <br />6.10 Construction Observations <br />We recommend that our representative be present during grading and foundation <br />excavation to observe that the work performed is in conformance with <br />specifications and recommendations provided here. We will also perform testing <br />as necessary to evaluate the quality of the materials and their relative compaction. <br />Records will be maintained of our site visits and test results. <br />At the completion of site grading and foundation excavation, we will submit a <br />summary of our observation and test results along with any necessary <br />supplemental recommendations. To assure that our personnel are at the site <br />when needed, we require that you notify us at least 2 working days before the <br />task begins. <br />7.0 LIMITATIONS <br />This report has been prepared for the exclusive use of the Client and the Client's <br />consultants for specific application to the proposed development. If changes <br />occur in the nature, design location, or configuration of the proposed <br />development, the conclusions and recommendations contained here shall not be <br />considered valid. Changes must be reviewed by our firm. <br />The analysis, opinions, conclusions and recommendations submitted in this report <br />are based in part on the referenced materials, site visit and evaluation, and <br />subsurface exploration. The nature and extent of variation among exploratory <br />borings may not become evident until construction. If variations appear, it will <br />be necessary to re-evaluate or revise recommendations made in this report. <br />=Korbmocher Engineering, Inc. <br />