Laserfiche WebLink
WESTERN FIBERGLASS,INC. 1-800-688-3375 <br /> TRANSITION SUMP BOXES <br /> Summary <br /> The Transition Sump Box shall provide a contained environment for piping and fittings from above <br /> ground product sources to underground systems,and as an above or below ground junction and <br /> termination box for both electrical and fluid piping and fittings.Tic transition sump shall contain <br /> environmentally hazardous fluids that might leak from piping terminations,fittings and flex-hoses <br /> contained within the transition sump box,have full ultra-violet protection and be suitable for use in all <br /> climates and conditions.The transition sump box shall be manufactured by Western Fiberglass,Inc. <br /> System Specifications: <br /> The Transition Box shall: <br /> 1.01 System Suitability: <br /> A, Be installed either above or below ground or partially buried to suit applications required. <br /> B. Be of sufficient size to allow all piping terminations,fittings,equipment,and flex-hoses to <br /> be contained within the Transition Box. <br /> C. Allow ampla area to provide for servicing and inspection of all piping terminations, <br /> fittings,equipment and flex-hoses within the Transition Box Assembly. <br /> D. Contain any release of earvirmrmental contaminates from piping and fittings enclosed <br /> within the Transition Box. <br /> E. Be available as a U.L.Listed device if required. <br /> 1.02 Construction Specifications: <br /> A. Meet or exceed United States National Bureau of Standards PS-15-69 for Custom Molded <br /> Reinforced-Polyester Chemical-Resistant Process Equipment or U.L. Listing if applicable. <br /> B. Be constructed of materials that aro not harmfbl to the environment. <br /> C. Be non-permeable by hydro-carbons and not weakened by axposure to these materials. <br /> D. Be unaffected by ultra-violet light oxposum and net weakened by much exposure. <br /> E, Be suitable for petrohmm products and blends. <br /> F. Have a thirty(30)year warranty. (excluding gaskets). <br /> 1.03 Release Monitoring shall: <br /> A. Allow full visual and physical accaeslmspection of all piping fittings and equipment. <br /> B. Provide a monitor point for an electronic probe and/or evacuation of fluids. <br /> M9pPPICNMRdWOR➢/aQID6P/IA.y�App[J�µgp <br />