Laserfiche WebLink
;;V+P <br /> NEW UNDERGROUND STORAGE TANKS - PLAN ADDITION CORRECTION SHEET <br /> The following checked and/or underlined items are to be addressed on plans : <br /> GENERAL <br /> l� Provide the name and address of the facility. <br /> - x.`2. Provide the name, address, and phone numbers of the contractor(s) , facility <br /> owner(s), and operator(s). <br /> f0VV4 3. Provide four complete sets of plans. (One to be retained by this office) . <br /> include specification sheets, equipment brochures, monitoring, and response <br /> plans. <br /> C �— 4. Provide plans to scale in nonerasable blueprint. <br /> CONSTRUCTION STANDARDS <br /> Location(s) and number of tanks. <br /> r�K 2. Type of tank(s) to be installed. 3rx� <br /> A. Steel clad with fiberglass reinforced plastic. <br /> 1 . 35,000 to 40,'000 volt Holiday Test required before "setting" tanks) <br /> in ground. <br /> B. in <br /> 6� Striker plate dimensions and materials. <br /> Striker plates under all accessible openings. <br /> C. onclad steel <br /> 1 . Cathodic protection provided (including nuts, bolts, washers, etc. ). <br /> a. Approved by a corrosion engineer or NACE technician. <br /> b. Document stating inspection method and frequency (Minimum semi- <br /> annual inspection required). <br /> D. Other types of tanks <br /> 1 . Construction specification standards for durability. <br /> _(�Lj. Tank Capacity (List specific gallonage) . j0 0w qC`A Q,o->\S <br /> 4. Contents to be stored in each tank (Be specific). <br /> A. Verification of product compatability with the tank(s), piping, monitoring <br /> device(s) , epoxy or silicone glues, etc. <br /> 1 . List testing organization and approval . <br /> _S. Provide manufacturers written installation instructions. (Include all piping, <br /> monitors, tan s, etc. <br /> Note - NFPA 30 Test required before covering tank and systems. NFPA 30 Test <br /> is require on BOTH the Primary and Secondary containment systems. <br /> Double walled tanks using pressure or vacuum testing to monitor annular <br /> space are exempt from testing secondary container. <br /> Note - NFPA 329 "Precision Test" required upon comm lleetion of installations. <br /> nne test result copy to be sent directly to this department from the <br /> testing company. <br /> 1,;J. <br />