My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1989
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
INSTALL 1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2019 11:30:42 AM
Creation date
5/15/2019 11:37:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1989
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ODEPTH OF EXCAVATION O EXCAVATION SIZE <br /> The hole must be deep enough to provide sufficient Stable Soil Conditions <br /> bedding and cover depth as determined by the type of Where shoring is not required to maintain a vertical wall <br /> surface pavement and loading. 30 and 31 should from top to bottom of the excavation, the minimum <br /> be consulted as well as local coddes.es. spacing between the sidewall or endcap of the tank and <br /> Tanks subjected toI r -_ side of excavation must be 24 inches(61cm). <br /> traffic loads must have 6" i- p — LAUim <br /> a cover depth of atI O 6„ If more than one tank is to be installed in the same hole, <br /> least 30 inches(76cm) 'I` there must be at least 24 inches (61cm) between the <br /> of backfill plus 6 inches I tanks. <br /> (15cm) of asphalt, An = I <br /> acceptable alternative 30 TRAFFIC <br /> DRY 8 <br /> IS a minimum Of 16 - CONDITIONS <br /> inches (46cm) of f'-Stable <br /> backfill plus 6 inches = 12 Soil <br /> (15cm) of steel re-bar <br /> reinforced concrete. <br /> I <br /> Tanks subjected to <br /> traffic loads and high <br /> water must have a 24 — 24' —►124rf— <br /> minimumof30inches <br /> (76cm) of backfill andI ,M <br /> either 8 inches (20cm) r ' `� 1= =1 II _ <br /> of asphalt or 6 inches FFIC A <br /> 'TR <br /> (15cm) of steel re-bar 30, AFT -30" <br /> reinforced concrete. CONDITIONS) <br /> - 12„ <br /> - Unstable Soil Conditions <br /> If the soil has less than 750 lbs/sq. ft. cohesion as cal- <br /> AdW+ culated from an unconfined compression test;or in soils <br /> Tanks not subjected to having an ultimate bearing capacity of less than 3500 <br /> traffic loads must have lbs/sq. ft.;or where soil will not maintain a vertical wall, <br /> a minimum cover P4" the excavation must allow a minimum space equal to 1/2 <br /> depth of 24 inches _ 4" 12' the diameter of the tank between the side and endcap <br /> (61 cm)of backfill,or 12 = _ of the tank and the excavation wall. The spacing be- <br /> inches (30cm) backfill A tween adjacent tanks, 24 inches (61cm), remains the <br /> plus 4 inches (10cm) = DRY same. <br /> of steel re-bar rein- - CONDITIONS <br /> _ NO �j <br /> forced concrete. _ TRAFFIC <br /> [III <br /> Unstable, <br /> V 1 12T, /2 Soil <br /> nk <br /> ia. <br /> Tanks in high water <br /> areas not subjected totraffic loads must havea minimum of 36 Tank <br /> inches (91cm) ofU36" Dia. 24backfill covering. "..'r `=h._ - -" <br /> NOTE: MANWAY RISER MUST NOT REST ON THE TANK.There <br /> must be a minimum six-inch space between the bottom of the riser <br /> and top of the tank. <br /> NOTE:These depths of cover are MINIMUMS for high water areas <br /> without traffic over the tank. <br /> NOTE:Asphalt and concrete pads must extend a minimum of 12 inches <br /> (30cm)beyond tank in all directions. <br /> NOTE:Maximum burial depth is 7 feet(2.1 meters)of cover over top <br /> of tanks. <br />
The URL can be used to link to this page
Your browser does not support the video tag.