My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1989
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
INSTALL 1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2019 11:30:42 AM
Creation date
5/15/2019 11:37:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1989
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 'ATE OF GUFOANIA <br /> + GEORGE DFUKMFJIAN Co r nar <br /> AUfORNIA REGIONAL WATER OLIALITY CONTROL BOARD— <br /> ENTRAL VALLEY REGION <br /> 4.3 ROUTIER AOM <br /> CRAMENTO,G 86827.3088 <br /> 29 December 1988 <br /> OFC n�� <br /> FNS/ 30 <br /> PFM/TMFNI <br /> Mr. John Margowski SF�q�FS�rH <br /> Wickland oil Company <br /> Environmental Affairs <br /> P.O. Box 13648 <br /> Sacramento, CA 95853 <br /> REGAL STATION #603, 6425 PACIFIC AVENUE, STOCKTON <br /> We have reviewed the 21 December 1988 letter from your consultant, <br /> Western Geo-Engineers, regarding the proposal to backfill the <br /> existing excavation and install an upgraded fuel system. <br /> We agree to your proposal, but only with the following conditions; <br /> 1. The installation of new tanks and the operation of the <br /> facility will not interfere with the ongoing investigation , or <br /> the future remediation of the sail and groundwater contamination <br /> at the site. This may mean the removal of the tank system at a <br /> future date if the contaminated soil beneath the tanks proves to <br /> be a source of groundwater contamination that cannot be <br /> remediated in place. <br /> 2. All activities will be coordinated with both this office and <br /> the San Joaquin Local Health District, and all necessary local <br /> permits will be obtained prior to the initiation of work. <br /> 3. A Problem Assessment Report will be submitted to this office <br /> and Ms. Diane Hinson of the San Joaquin Local Health District, by <br /> 17 Pebruary 1989 and will follow Region 5's Appendix A of the <br /> Tri-Regional Board Guidelines (enclosed) . <br /> Please inform us no later than 13 January 1989 if these conditions <br /> are acceptable, and of the dates you plan to perform the proposed <br /> work. If you have any questions, please call me at (916) 361- <br /> 5721, <br /> r11�' nn-Hewma <br /> WRC Engineer <br /> BCN:bcn <br /> Enclosures <br /> cc w/o enc: Ms. Diane Hinson, Ban Joaquin Local Health <br /> District, Stockton <br /> w/enc: Mr. Kevin Huntar, Exxon USA, Houston <br /> Mr. George Converse, Western Geo-Engineers, <br /> Woodland <br />
The URL can be used to link to this page
Your browser does not support the video tag.