Laserfiche WebLink
10/15/00 09:21 FAX 707 007 2922 W A CRAIG INC 206 <br /> UST Cloattre Work Plan C=ba 6,2000 <br /> 6425 Pacific Au w Pnyeu No.3944 <br /> Stakuc Calirm _ Pagel <br /> maintained. Care will be taken such that the Teflon sheets are not wrinkled. <br /> Soil samples selected for analysis will be labeled indicating project name (or number), sample <br /> number, sample depth, date and collection time. The same information will be recorded on the <br /> chain of custody form. Soil samples will be placed in a cooler with frozen gel packs or ice. The <br /> sample cooler will be delivered to the analytical laboratory within 24 hours of collection. <br /> Based on our knowledge of the Site from previous investigations conducted at the Lincoln <br /> Center, groundwater will be not encountered in any of the borings. Thus, no groundwater <br /> samples will be collected <br /> 3.4 Laboratory Analyses <br /> I <br /> Soil samples will be analyzed by a state certified analytical laboratory for the gasoline <br /> constituents' benzene, toluene, ethylbenzene and total xylenes (BTEX) by EPA method 8020. <br /> TPH-g will be analyzed by EPA method 8015,modified Fuel oxygenates (MtBE, TAME, DJPE, <br /> ETBE and TBA) and lead scavengers (EDB and 1,2-DCF) will be analyzed by EPA method <br /> 8260b. <br /> 3.5 Field Equipment Decontamination Procedures <br /> The sampler will be decontaminated before and after each use by steam cleaning or washing in a <br /> laboratory grade detergent solution, followed by tap water, or deionized water rinses. Potable <br /> water will be used for decontamination of drilling equipment, <br /> All rinseate water used in the decontamination process and all purge water and soil cores from <br /> the temporary wells will be stored on-site in steel DOT approved drums. Drums will be labeled <br /> as to contents, date container filled, company name, and sealed The drums will be left on-site <br /> for subsequent disposal pending analytical results. <br /> 4.0 UST CLOSURE REPORT <br /> A UST Closure Report will be prepared and submitted to the SJC-EHD and Sims- irupc <br /> Management Corp. The report will include site history, figures identifying sample locations, <br /> drilling logs, laboratory analytical reports, a summary of all work performed, a tabulation of <br /> analytical results and conclusions and recommendations regarding additional work, if necessary. <br /> The report will be prepared under the direct supervision of a licensed professional engineer or a <br /> registered geologist. The report will comply with the requirements of the Tri-Regional Board <br /> Staff Recommendations for Preliminary Investigation and Evaluation of Underground Tank Sites <br /> (August 30, 1991). <br /> N%Tom\d',Central Projwt File13944 Skxkton\Warkpleadoc <br />