My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL 2000
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
REMOVAL 2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2019 1:42:27 PM
Creation date
5/15/2019 11:39:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2000
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10/17/2000' 09: 00 2094663ag3 FIFTH FLOOR PAGE 11 <br /> ACKPILL EXCAVATION CERTIFICATE <br /> Project Location 6425 PCIFIC AVENUE STOCKTON , CA 95207 <br /> Owner MASON CENTER LLC/MARK YEKTA phone No.g75_83n_3444 <br /> ContractorW- A. CRAIG INC Phone No.7 0 7—6 9 3—2 9 2 9 License No. A 4 5 5 7 5 2 <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br /> y 2. Submission of verification, e.� , load ticket, within 3C days of project completion that one of tltc following materials was <br /> placed in the excavation in 12' lifts: <br /> A. Pea gravel--smootb, rounded material not more than one-half(112) inch in diameter <br /> _ B. Crushed rock—self-compacting material not more than three-quarters (3/4) inch in cross sectional <br /> measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between the <br /> backfill material and tenks)pipes made of poly resin glass or similar maoerials J <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days of project completion, or submission of <br /> verification il= the select material described above w01 be placed at a mimimum of five (5) pubic yards per 1OW gallon tank <br /> displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br /> Appendix Chapter 70. <br /> ame t <br /> m <br /> awe <br /> " Shall be the responsible managing employee on the license or authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.