My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
INSTALL 2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2019 11:32:25 AM
Creation date
5/15/2019 11:44:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2001
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
247
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�standard E Petro <br /> ANUAL PRESSURE RELIEF: ISO 9001 CERTIFIED: <br /> • F <br /> feature. When <br /> /1 ( necessary during <br /> l maintenance to bleed ' <br /> line pressure to zeroa <br /> vent screw is provided. <br /> By turning this screw. <br /> product is diverted <br /> back to the tank, <br /> dropping line <br /> pressure to zero. <br /> Reduces fuel discharged into the sump FE Petro's quality commitment to supply <br /> a world class product in accordance with <br /> manhole or dispenser pan during servicing, internationally recognized quality stan <br /> further protecting service technicians and tli <br /> environment. <br /> SIMPLE SERVICING: <br /> If ever required, the The FE Petro optional single phase motor control box <br /> pump can be easilc is available in two configurations.These control <br /> removed from the boxes are UL listed,CSA Certified or GUL listed and <br /> tank by unthreading fit any horsepower FE Petro 4"submersible.Models <br /> three bolts.There is are available in both L0 volt and 220 volt coils for 50 <br /> ( no need to disconnect and 60 Hz power supplies.Please specify. <br /> the syphon system,or STP-CBS:Control Box with wiring <br /> remove the leak terminals,contactor relav <br /> detector from the and pilot light with lock <br /> system to service out toggleswitch.One <br /> the STP. required per pump. <br /> Enclosure size is <br /> = ,: 8 1/2"x 513,1°x 2 t.s" <br /> This feature reduces the risk of correcting one-f, (216mm x 148mm x 7:3mm). <br /> problem and causing another. Y <br /> 0. , <br /> STP-CBR#:Our 4 <br /> VERTICAL DISCHARGE: pump motor <br /> relays <br /> Another unique feature of FE Petro. Provides for fontr submller ersibles, <br /> a simple connection tc .tnderground piping. <br /> for}submersibles, <br /> Plus voltage surge <br /> _ arrestors to arrest <br /> power surges over <br /> 500 volts.Enclosure size is 14'x Llx <br /> (:356mm x 279mm x L7mm). <br /> IFS:Our intake <br /> Filter screen <br /> option utilizes <br /> -316 stainless Q r <br /> steel to filter <br /> l ' particles r� <br /> This feature allows for fewer fittings to connect '' 0119"('''mm)and larger.It can significantly <br /> the pump to the discharge line,and requires ". reduce dispenser Filter changes,reducing <br /> less space in the sump. , maintenance costs by 100's ordollars per year. <br />
The URL can be used to link to this page
Your browser does not support the video tag.