My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
INSTALL 2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2019 11:32:25 AM
Creation date
5/15/2019 11:44:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2001
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
247
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MANUAL PRESSURE RELIEF: ISO 9001 CERTIFIED: <br /> A standard FE Petro <br /> feature.When +a <br /> necessary during <br /> maintenance to bleed <br /> line pressure to zero, a <br /> vent screw is provided. ' ))) <br /> By turning this screw. `� l <br /> product is diverted <br /> back to the tank, / L <br /> dropping line •• <br /> pressure to zero. <br /> FE Petro's quality commitment to supply you <br /> Reduces fuel discharged into the sump a world class product in accordance with <br /> manhole or dispenser pan during servicing, internationally recognized quality standards. <br /> further protecting service technicians and the <br /> environment. <br /> SIMPLE SERVICING: <br /> the r The FE Petro optional single phase nwtor control box <br /> If ever required, <br /> pump can beasily is available in two configurations.These control <br /> � 1. boxes are UL listed.CSA Certified or C-UL listed and <br /> removed from the fit anc horsepower FE Petro 4"submersible.Models <br /> tank by unthreading <br /> three bolts.There is are available in both L'0volt and 220 coir coils for 50 <br /> no need to disconnect and 60 Hz power supplies.Please specih. <br /> the syphon system,or STP-CBS:Control Box with wiring <br /> remove the leak terminals,contactor relay <br /> detector from the and pilot light with lock <br /> system to service out toggle switch.One <br /> the STP. required per pump. <br /> Enclosure size is <br /> 81 _"x5r3/n6"x2 <br /> This feature reduces the risk of correcting one (216mm x 148[mn x smm). <br /> problem and causing another. <br /> STP-CBR4:Our 4 <br /> pump motor <br /> VERTICAL DISCHARGE: controller has relays <br /> Another unique fear[[re of FE Petro. Provides for for 4 submersibles. <br /> a simple connection to underground piping. plus voltage surge <br /> arrestors to arrest <br /> t power surges over <br /> 000 volts.Enclosure size is 14"x 11'x S" <br /> (356ntm x2i9mm x LSmm). <br /> IFS:Our intake <br /> filter screen t <br /> I <br /> option utilizes �„- <br /> 31ti stainless <br /> steel to filterZo s i}- - <br /> parTicles d <br /> This feature allows for fewer fittings to connect 0m) l23mm)and larger.It can significantly <br /> the pump to the discharge line,and requires reduce dispenser filler changes,reducing <br /> less space in the sump. maintenance costs be 111o's of dollars per,y'ear. <br />
The URL can be used to link to this page
Your browser does not support the video tag.