Laserfiche WebLink
SYSTEM DRAWING INFORMATION <br /> XThree complete sets of plans (include manufacturer'* specification sheets for proposed equipment to be installed). <br /> Plana drawn to scale in non-erasable print. <br /> Plot plan to show location of tanks and all associated piping. <br /> Striker plates or drop tube-mounted bottom protectors iltustrated below all accessible openings. <br /> Tank cross-sectional diagram. <br /> Detail of tank, associated piping, excavation and cover. <br /> .� Tank(s) and piping approved by a rarc(onallr recognfmi indepoident resting arganizattan, 1ritle 73, Chapter 16, <br /> \l Article 3, Section 2631 (b) & 26351 <br /> f <br /> Verlf ira:lx of prod,xr acmpatib+:)ty wf rh the tarWC(s), piping, moral Coring <br /> device(:), epoxy or silicone gtues, etc. <br /> _ Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. <br /> X At the inst.1kxien site, prior to inste'.lat)or., a tightrass tts't shall %% performed on both primary (10) and <br /> secondary (2") cartairi nr systems before covering_ (Section 2635 (a) (3) L (4)] <br /> Tank integrity test required upon completion of Installation with tank in operating condition. Test results to be <br /> :omitted dirattly t0 ?%S-END from the testing company or owner Of facility. (Health 8 Safsty Code, oiviaian 20, <br /> Chapter 6.7, Section 25291 (h)) <br /> TANK COMPOSITIGN <br /> ,NK r I >: s 3 r r <br /> mMc IN <br /> .NUFACMRER KEKES XER F <br /> IMPOSITION 11 E �ai'.��.fj EflGIAS 'G E R G i Aj5 <br /> OEL " <br /> YIROSICM PROTECTION YE r 1 rc_ YF, l FSJ <br /> L- LISTED <br /> _WAATOe1LITY WITH 100% VTHAN <br /> TANK(e) TO BE IMSTALLRD •7 <br /> A. staet-clad with fiberslatu reinforced pi-wstic coatings, composites, or equivatent non-metallic exterior <br /> coatings or coverings. <br /> Tested at the installatian site using an electric resistance holiday detector. <br /> (2) Vacuum applied to interstitial space. <br /> g, Ftbergtass <br /> S (1) Installation instructions require an air test and soap bubble test prior to installation. <br /> (2) Vacuum applied to interstitial space. <br /> (3) Hydrostatic annular (primary tank pressure test), <br /> C. Non-clad steel tank [Section 2635 (a) (2) (A)I <br /> (1) Cathodic protectlon provided for entire tank, piping and components (nuts, bolts, washers, <br /> etc.). <br /> �\ k (2) field inatalled cathodic protection systems designed aril cert triad as adequate by a <br /> \J rkcorrosion speciallat. <br /> (3) Impressed current systema to be inspected no less than every 60 days. <br /> 5 <br /> L 'd iV02id LV'9'ZV'6 0002-0 L—t <br />