Laserfiche WebLink
ent By: CPE; 916 372 9335; Dec-26-99 19:01 ; Page 20/38 <br /> OPW b 150 OVERFILL PREVENTION VAIVES <br /> Our Patented Design is the Features of the 61SO Series: <br /> Most Effective and the o Simple,easy and quick installation <br /> Most Versatile. -noexcavation or special manholes <br /> The OPW 6150 Overfill Prevention regwred• <br /> Valve is designed to prevent the overfill •Economical-costs a traction of <br /> of underground storage tanks by pro- expensive,complicated and difficult <br /> viding'a positive shat-oft of product to install valves. <br /> delivery.The shut-off valve is an inte- ♦Furnished complete-supplied <br /> gral part of the drop tube used for gtv- With new upper and lower drop- <br /> ity filling.The OPW 6150 allows easy rubes,mounting hardware and <br /> installation(without breaking concrete) thorough instructions for quick job <br /> and requires no special manholes. Site time. <br /> The OPW 61 SO is a two-stage shut- •Completely automatic operation- <br /> off valve.When the liquid level rises to no prechecks to perform,no resets, <br /> about 95%of tank capacity,the valve and no overrides to be broken or <br /> mechanism is released closing automat- abut• <br /> ically with the flow.This reduces the ♦No Pressurization of the tank- <br /> flow rate to approximately 5 gpm operates directly from liquid level, <br /> through a bypass valve.The operator o Will accept a dipstick for gauging. <br /> tray then stop the filling process and • Retrofits directly-for both new <br /> disconnect and drain the delivery hose. anc{existing tanks with 3"or 4"fill <br /> As long as the liquid exceeds the 95% ricers <br /> level.the valve will close automatically Quick drain feature- <br /> each time delivery is attempted. Automatically drains hose when <br /> If the delivery is not stopped and the head pressure is relieved, <br /> liquid rises to about 98%of tank capac- #Best flow rate in the industry." <br /> ity,the bypass valve closes completely. <br /> No additional liquid can Raw into the Advantages of Overfill <br /> Po <br /> tank the level drops below a reset-point. <br /> eset Prevention Compared to <br /> Models of the 61 SO are available to Overfill Warning Systems: <br /> meet virtually any UST application Completely automatic operation- <br /> including two point,coaxial,poppeted does not rely on the alertness or <br /> coaxial and remote fill.The 61 SO-3000 speed of response of the delivery <br /> provides two point overfill protection attendant-for certainty of overfill <br /> for 3" riser pipes,and the 61 SO-1000 prevention. <br /> and 61 SO-100C(CA1tB)feature a ♦Keeps the top of UST"dry", per <br /> grooved tube design for use with tank EPA requirements-eliminating <br /> gauging systems. Methanol and GARB possible leaks at louse bung fittings <br /> (vapor tight)approved models are also and the need for double containment <br /> available.The OPW'61SO is approved on vent lines. <br /> by the New York City Fire Department- ♦Dues not rely on pressure in the <br /> (Approval#4902). UST to stop now-al)owing faster <br /> fill times and reducing spill risk. <br /> •Speeds delivery operations- <br /> proluct flows unimpeded into the <br /> tank until the hose"kick"that <br /> accompamfes the valve shut-off <br /> provides a clear signal that the liquid <br /> has reached the shut-off level. <br /> ' •Simple and inexpensive installation- •Test witnessed by Bowser-Momer, <br /> in both two-point and coaxial fill Inc.,an independent laboratory. <br /> applications,no additional excava- Results available upon request. <br /> tion,manholes or vent piping is <br /> required. <br /> O W W&0ux t:ISIS)170,2219.1800)421.2525•to!(513)OM910i•10018)421-3297 <br /> _ ^•^'^- ��" e t 997 OPW Fueling Components•F.G.hr 4805-Grcenmi,Ohio 452405003•Primed In OSA-TE4150F•4197 <br />