Laserfiche WebLink
03/13/01 12:39 FAX 707 693 2922 W A CRAIG INC Q05 <br /> Data:03di=001 Time:2:58:24 PM Tom SMIM Vasey Asanciatt% Pape 2 or 2 <br /> 3. Insert (dry)thin gasket(larger diameter first) on B-1R sleeve Fig. 2 <br /> through ilex cururector(see Fig_ 2). Insert flex boot through 3"UI-o g �� <br /> flex connector till boot covers B-19 and sleeve. Alignhosecamp sninles�liaed ao,c <br /> ap It Is pMleec With fitting. clamp /IN <br /> 3"Thingiskd. <br /> 4. Using provided UL epoxy coated hose clamp,tighten flex boot <br /> to B-I R fitting applying a minimum of 4 tl.-Ib.(5.5 N-tn.)torque <br /> using a 5/16"socket screwdriver. 3"FRP <br /> SecondaryPipe 3"flex boot <br /> 5. Single-Wall Piping. When connecting to a primary line factory glued <br /> depending on the diameter of pipe installed,use an optional BR- <br /> 3x2reducer.First insert(dry)thin gasket(srnaHer diumeRr first), Fig. 3 Sjllple-Wal jpine <br /> then,slide corresponding reducer over FRP pipe and seal it using <br /> provided UL epoxy coated stainless steel hose clamp (see Fig. <br /> 3). Test flex boot up to a maxiatturn of 5 psi. For miliary line, thin <br /> please refer to pipe rttunuadctrrrer instructions for maximum est BR-3-x2 reducer---. gasketpressures. <br /> 6. Double-Wall Piping, When connecting to 3" fiberglass <br /> secondary piping,follow pipe nfanutucture's rncrnrurredarion for UL expoxy e <br /> fiberglassing split couplings to 3" FRP pipe factory glued to stainless steel clamps <br /> Bravo flex boot.After fibesglassing the 3"pipe to split coupling <br /> wait for the recenmiended tunic by the FRF pipe manufacture <br /> then test flex boot up to a maximum of 5 psi. For primary line, <br /> please refer to pipe manufacturer instmctions for maximum test Fig. 4 Double-Wall Pioine <br /> pressures. <br /> /3"ilex toot <br /> MALASSEM BLY 3"fiberglass <br /> (double-welt piping Pipe <br /> assembly shown) o <br /> NOTE:3"Pipe required be cut <br /> ApplIWIR 10 1.1 cul etre to length as requited <br /> apinm to isdaic <br /> epoxy coated <br /> ,males,creel clamp, <br /> 7. Aflera sax;e sful test of the secondary piping systemapply white <br /> vulkem to complete exterior of the stainless steel coated camps, <br /> approximately 1/4"thldk,see above imagE: Let the sealant forth <br /> a'skim'or hanlen then backfill%ith approved peaggavcl perprrie <br /> manufaatuersspecRaetiorti For single wall applications isolate <br /> epoxy coated stainless steel lifted clamps by applying vulkem as <br /> described above. <br /> WARRANTY <br /> All a?nmlmmcnt systrms sold by S.Bravo Systcros,Inc.arc warranted to be free from defect in material and workmatuhip for a period ofam <br /> year from tine date of purehasc.This warranty will be limited to the repair and replacement of parts only,and will exclude all claims for labor or <br /> consequential damage.No other express wanantics given and no affi matim of S.Bravo Systems, toe.,ur its agents and(or representatives,by <br /> words or action,will corxtimtc a warranty. IT IS EXPRESSLY AGREED THAT THIS WARRANTY WILL BE iN LIEU OF ALL W.4RRAN. <br /> TIES OF FITNESS AND IN LIEU OF THE WARRANTY OF MERCHANTABILITY. <br /> This wammnry is void if there is auy evidence of modification,ebuso,negligence,or unproper installation. If any fittings or components,other <br /> than S.Bravo Systems approved fitting.+or componcntrs are used in crmiiaw irnr with any S.Bravo Systems prodaet,the warranty pertamirtg to <br /> these prndncfr,is ni m iliarcly void. <br /> 19 S.Bravo Systems,Inc. <br /> 2429 Wail Avenue. • : 323-8 9- 12 90040 `. <br /> 323-888-4133 - Fax: 323-RRR-4123 <br /> E-mail: info@o)vbravci•Inttp://www.sbravo.com <br />