Laserfiche WebLink
01/25/01 14:29 FAX 707 699 2922 W A CRAIG INC a04 <br /> 3. Insert(FRP)pipe into B-33 sleeve through flex connector(see Fig.2 B-33 fitting -�5/8"base <br /> Fig.2).proceed to insert flex boot through flex connector and 3"sleeve clamp clamps <br /> the provided 5/8"hose clamp. Slide flex boot inside BR-3x2 inside box. <br /> Reducer sleeve until pipe passes hose clamps located with 3-FRP <br /> dispenser Containment containment. ,nay be as to fit pipe . <br /> m <br /> 4, Using provided hose clamp,tighten flex boot to B-33 and BR- <br /> 3x2 fitting applying a minimun of 4 ft.-]b. (5.5 N-m.)torque 3"F" 3"flexltoot <br /> using a S/16"socket screwdriver. secondary P <br /> ipc iAama Std <br /> S. Slagle-Wall Plping.When connecting to a primary line - <br /> depending on the diameter afpipe installed,use an optional BR- Fig. 3in W - - <br /> 3x2 reducer.First insert(dry)thin gasket(smaller diarn=first); <br /> then,slide corresponding red tcaoverFRP pipe and seal it using Orin <br /> provided UL expoxy coated Ardnlem steel hose clamp(see Fig. BR-3x2 gasket <br /> 3)-Test flex boot Up to a maxianun of 5 ps4 For Hutu ry lime, rodueR <br /> please refer to pipe manuf enmerinsdru tioosformaximumtest <br /> pressures. <br /> 6. Double-Well Piping. When connecting to 3" fiberglass U,cipoxyc lcd <br /> secondary piping,faUowpipemmnfam='srecommedadoufor staidessstcelclam <br /> fiberglessing split aotrplings to 3"FRP pipe factory glued to <br /> Bravo flex boot.After fiberglassing the 3"pipe to split Coupling <br /> wait for the recommended time by the FRP pipe enamdactme <br /> then test flu boot up to a maximum of 5 psi For primary tine, Fig. 4 t R' - - <br /> please referto pipe n mlu>Bcb=insimmIlOds formmdmtmt test /3"flex boot <br /> pies. 3" <br /> fiberglaser <br /> FINAL ASSEMBLY pip` 1� <br /> (doisble-wall piplRq ' <br /> assoutbly abosye) _ NOTE:3"pipentaybecut <br /> w length as requited <br /> 7. For single wall applications isolate epoxy coated stainless steel <br /> lined clamps by apply volkem after a Successful test of the <br /> secondary piping sYst= Apply vulkem to camplde exterior Of <br /> the stainless steel coated clamps Apptozimately Un,"IW4 see <br /> above imago fig 3- Let the sealant form a'skin'or harden then <br /> backfill with approved peagmvel per pipe manufacturers <br /> specifications. <br /> . WARRANTY <br /> All conmuoarnt systems mid by S.Bravo Syueas,Ina see wwTw ted to be fife fiooa defect in materiel and wsalanensltip for a padod of ams <br /> year from dw date of lavehn e.This waraulY will be limited to the repay and r of Pam ooly,and will exchde all elaims for Lear or <br /> ansequetial damaW-No other apeme warannes given std no dfvmarioa of S Bow Syvaire,Tac..or us agema mWor represaaadve,M <br /> word,or action,will ramstitato■we"aly,R IS WWRESSLY AGREED THAT TMS WARRANTY WU-L BE IN=OF ALL WARRAN- <br /> TIES OF FMZESS AND IN LEU OF THE WARRANTY OF NaiRCHANTABHX1 Y- <br /> This wemaay is void if Ihme is airy evidwes of modificatim abuse.nrg4gmca,er mtlweper°tsr+l""n.If naY 6tonp or conrpoam.+.other <br /> dYn S.Bravo Sysmm approved fim�or mraporimt%are used in myrmrtlm with aey 5.Bravo Sysrcms puodut�the wwmmxy 1�p1ag ro <br /> these toomrts is uruYaEmeb void <br /> S.Bravo Systepls,Inc. Y C Mar a <br /> 2929 Vail Avenue.•Commerce.CA 90040 P E <br /> 323-888-4133 •Fax:323-888-4123 4nerou"ar+•tw <br /> BR E-mail:info@-gbmvo.com•bttpJ/www.sbmvo.coru <br /> AVO <br /> 47411 <br />