My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL 2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
REMOVAL 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2019 12:02:56 PM
Creation date
5/15/2019 11:52:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2003
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CKFILL EXCAVATION CERTIFICATE <br /> Project Location 6425 Pacific Ave. , Stockton, CA 95205 <br /> Owner Safeway, Inc. Phone No. (925)467-2068 <br /> Contractor Jim Thorpe Oil , Inc. Phone No.(209)368-517: License No. (20P)2(;R-A175 <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> _ 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br /> X 2. Submission of verification, e.� , load ticket, within 30 days of project completion that one of the following materials was <br /> placed in the excavation in 12' lifts: <br /> _1 A. Pea gravel--smooth, rounded material not more than one-half(1/2) inch in diameter <br /> B. Crushed rock--self-compacting material not more than three-quarters (3/4) inch in cross sectional <br /> measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between the <br /> backfill material and tanks/pipes made of poly resin glass or similar materials.) <br /> 1 <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days ofpproject completion, or submission of <br /> verification that the select material described above will be placed at a minimum of five (5) cubic yards per 1000 gallon tank <br /> displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br /> Appendix Chapter 70. <br /> Jim Thorpe Oil , Inc. <br /> * <br /> azne tint <br /> * Contractor <br /> e t <br /> * By � A - Ll <br /> a Signature <br /> * Shall be the responsible managing employee on the license or authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.