My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2012 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
COMPLIANCE INFO 2012 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2019 5:10:41 PM
Creation date
5/15/2019 2:24:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012 - 2018
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
518
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
From: Keith Powers fmailto:Keith.Powers(dfeway.com] <br />Sent: Friday, February 17, 2017 12:23 PM <br />To: Vicki McCartney [EH] <br />Cc: Store 2707 c60 - Fuel Station Manager; Aldo Basurto; Ron Lee; Carissa Colli <br />Subject: Safeway Fuel Center #2707 Inspection 1-19-2017 <br />Ms. McCartney, <br />This is in response to the Underground Storage Tank Program Inspection performed at the subject site on January 19, <br />2017. <br />Summary of Violations: <br />Item #105 <br />Completed, submitted on 1/20/2017, accepted on 1/24/2017 <br />Item #107 <br />Completed, submitted on 1/20/2017, accepted on 1/24/2017 <br />Item #121 <br />A response to the January 20, 2016 inspection was submitted to Fatinah Zareef of your department on February 18, <br />2016. See attached email. <br />Item #201 <br />Corrected on site. <br />Item #306 <br />Corrected on site. <br />Item #315 <br />Corrected on site. Note: Service Contractors will inspect and caulk the base of the 7/8 dispenser as needed, weather <br />permitting. Additionally they will inspect the 87 product fill sump lid/gaskets and repair/replace as needed. We <br />anticipate this work will be completed by March 3. <br />Item #319 <br />Completed, the 91 spill bucket was replaced on 2/16/2017. <br />If you should have any question please contact me or Aldo. <br />Keith Powers <br />Environmental Compliance Manager <br />Corporate Environmental Affairs <br />925-738-1277 <br />510-246-0358 cell <br />623-869-1548 fax <br />AlbBitS011S' <br />` Please consider the environment before printing this e-mail <br />
The URL can be used to link to this page
Your browser does not support the video tag.