Laserfiche WebLink
SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />1868 East Hazelton Avenue, Stockton, CA 95205-6232 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.s'gov.org/ehd <br />UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br />Facility Name: <br />n k0b <br />Leak detector <br />Inspection Date: <br />❑ mechanical Model: <br />❑ electronic Serial #: <br />THIS FACILITY IS SUBJECT TO REINSP Y TIME AT EHD'S CURRENT HOURLY RATE. <br />Facility Address: <br />❑ <br />Leak detector <br />Service Request #: <br />-Q a <br />c�, <br />S ao <br />® �Ol <br />n <br />Onsite Service Tec nician's Name: <br />ICC Service Technician Installer Exp. Date: <br />Manufacturer Training: <br />VICt5 <br />e <br />- I I - <br />L 12 -61-I <br />SERVICE <br />n k0b <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ electronic Serial #: <br />THIS FACILITY IS SUBJECT TO REINSP Y TIME AT EHD'S CURRENT HOURLY RATE. <br />❑ line test programmed <br />❑ <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ electronic Serial #: <br />❑ <br />❑ line test programmed <br />sensor <br />El <br />positive shutdown Model: <br />El <br />❑ fail safe Serial #: <br />❑ NA <br />❑ <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ <br />❑ fall safe Serial #: <br />❑ <br />❑ NA <br />❑ <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ NA <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Overfill prevention (see LG letter 150-1) <br />This UST facility is APPROVED to operate <br />SERVICE <br />n k0b <br />Spill bucket .minimum 5 gallon <br />�1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />THIS FACILITY IS SUBJECT TO REINSP Y TIME AT EHD'S CURRENT HOURLY RATE. <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Primary piping testing at: <br />❑ <br />psi <br />minutes <br />Secondary containment testing for: <br />UDC(s) Piping <br />Sump(s) UST(s) <br />❑ <br />Testing for the above components are next due by: <br />Note: Please be aware that 2° containment components are required to be teste l upon <br />installation, 6 months after, and every 36 months thereafter. <br />❑ <br />Cold start of monitoring panel <br />❑ <br />Corrosion protection <br />❑ <br />Other: see below <br />❑ This UST facility is NOT APPROVED to operate <br />t 1 t — <br />n k0b <br />er �w \sse <br />THIS FACILITY IS SUBJECT TO REINSP Y TIME AT EHD'S CURRENT HOURLY RATE. <br />EHD Inspector:eceive <br />Title/ <br />( Ccik <br />EHD 23-04 LJ V UST SERVICE REQUEST INSPECTION REPORT <br />Rev 4/30/12 <br />