My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2012 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
COMPLIANCE INFO 2012 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2019 5:10:41 PM
Creation date
5/15/2019 2:24:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012 - 2018
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
518
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cafkpi 0:CQW2; WILL <br />CCEH7P,Ui R A38EWPULEES <br />ar=% F1C&TI6P.3: <br />'D ELLOWGI BUNA N, RUBBER. <br />'LIELLOWG "I APf4ED{110k I:IkC1 DUCTILE IRON. <br />' DF ILL COAf7AI N1E121 BLACK CROSS-LINK <br />POLYETHYLENE. <br />'DeLafa VALVE [,DD'Y,: 356T6 HARD COAT <br />ANODIZED ALUMINUM. <br />FL4MOIE Co R1PRESSIOU PJP1O: DUCTILE IRON. <br />°OVAL ORAIW FLA91L61E- DUCTILEIRON. <br />`ROUKO FLANDEt DUCTILE IRON. <br />MPRP-10 <br />80410" <br />Suna N. rubber <br />STP42 <br />5 pallon oontasnmenl <br />With oval CUIOUI <br />Low density poiyethytena <br />RP12-PUSH <br />Drain Valva AasembN <br />STP -22, Oval <br />Drain Flange' <br />MI6p c0 m2 <br />L Y Oduc4 <br />' THE SPILL CONTAINERS ARE PRE -ASSEMBLED AT THE <br />FACTORY FOR EASE OF INSTALLATION. <br />`MAKES FOR A CONTRACTOR FRIENDLY INSTALLATION. <br />'ONCE THE TANK RISER IS MEASURED AND INSTALLED <br />THE DROP TUBE GOES IN PLACE. REMOVE THE <br />CDN7AINMENT FROM THE BOX. PUT ff ON THE RISER, <br />SCREW rT ON AND TORQUE IT TO 19&20,7 FOOT LBS. <br />STP -13 <br />4 PC. Ballow& <br />Reinforeomani Plales <br />beaCWPTLOd <br />CON iNMAENl 1NSTALLAnONlq PAR70 <br />MADE OF OVCTIIE 10.0N EVRSYS11s <br />STP•17. Oval Flange <br />Comprosslon Ring <br />MPRP <br />Bollr <br />Buns N, RubIR <br />STP -4; <br />5 Patton Containmsn <br />with round culoul <br />Low donsIly polyathyiene <br />STP -24, Round <br />Drain Flange <br />Vapor., <br />STP -13 <br />a PC. Bellows <br />Rainforcemanl Plates <br />STP -18, Round Flarv,7e <br />:ompNEISGI n Ring <br />RECEIN E-1 <br />APR 2 3 2015 <br />Y'1410 6 kfy 18 VOT&LLY IRE-Ac,SMA12LED %-e TF9m f,NVIRONMENTAI. <br />"AcroLZY FOP SAGE OF INISTB.LLATION. ,•-c,,•. ••�'�"�T••�"„ <br />ro (AL1 BROWN Ilk TKF CRO' EcCTION 6;8-OVE) ' <br />L: <br />
The URL can be used to link to this page
Your browser does not support the video tag.