Laserfiche WebLink
Executive Order VR -104-C - NI Manufacturing Phase I Vapor Recovery ;tem, Exhibit 1, Page 1 <br />Exhibit 1 <br />CNI Manufacturing Phase I Vapor Recovery System Equipment List <br />Equipment <br />Containment Assembly <br />Pressure/Vacuum <br />Vent Valve <br />Gravity Cover <br />(used for CON 1, CON2 or 214 <br />Containments) <br />Snap Tight Cover <br />(used for CON 1, CON2 or 205 <br />Containments) <br />Snap Tight Cover Ring <br />Manufacturer/Model Number <br />CNI Manufacturing XXXX-31103 <br />(31103 denotes EVR System) y ECEIV ) <br />2 point System Configuration: <br />XXXX (four digit code) indicates: <br />CONI —Vapor Assembly <br />(5, 10, and 15 gallons) <br />CON2 — Product Assembly <br />(5, 10, and 15 gallons) <br />APR 2 3 2015 <br />ENVIRONMENTAL <br />Stand Alone/Direct Bury Configuration: <br />XXXX (four digit code) indicates: <br />205P - Product Assembly <br />205V - Vapor Assembly <br />(205 series are 5 gallons) <br />214P - Product Assembly <br />214V - Vapor Assembly <br />(214 series are 5 gallons) <br />Husky 4885, 2 -Inch Threaded <br />CNI Mfg. GAC <br />CNI Mfg. STP -200 <br />CNI Mfg. STP -39 <br />CNI Mfg. Stand Alone/Direct Bury Configurations 205P, 205V, 214P and 214V are not certified for use in <br />a sump configuration. <br />CNI Manufacturing Phase I Vapor Recovery System — VR -104-C <br />