Laserfiche WebLink
JAN -30-2013 1051 Service Station Systems <br />10. FILL RISER CONTAINMENT SUMP TESTING <br />Facility is Not Equipped With Fill Ricer Containment Sumps ❑ <br />Fill Riser Containment Sumps are Present, but were Not Tested ❑ <br />Test Method Developed By: C7 Sump Manufacturer ® industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure ❑ Vacuum 0 Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: Triton Sump Tester Equipment Resolution: +/- 0.002" <br />Fill Sump # 87 Fill Sump # 91 Fill Sump # Diesel Vent Sump <br />Sum2 Diameter: <br />42" <br />42" <br />42" <br />18" <br />Sump Depth: <br />81" <br />80" <br />81" <br />31" <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />36" <br />34" <br />36" <br />8" <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />34" <br />36" <br />32" <br />1011 <br />Condition of sump prior to <br />testing: <br />Good <br />Good <br />Good <br />OK <br />Portion of Sump Tested <br />2" above piping <br />2" above piping2" <br />above i in <br />Sum Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Wait time between applying <br />pressure/vacuum/water and <br />stardri test: <br />30 minutes <br />30 minutes <br />30 minutes <br />30 minutes <br />Test Start Time: <br />10:03 am <br />9:25 am <br />8:55 am <br />lnitial Reading (Rl): <br />4.7999 <br />5.7470 <br />4.7139 <br />Test End Time: <br />10:18 am <br />9:41 am <br />9:10 am <br />Final Reading (Rr): <br />4.8001 <br />5.7470 <br />4.7131 <br />Test Duration: <br />15 min. <br />16 min. <br />15 min. <br />Chane in Reading %r-Rj): <br />0.0002 <br />None <br />0.0008 <br />Pass/Fail Threshold or Criteria: <br />+!- 0.002" <br />+/-0.002" <br />+/-0.002" <br />Test Result: <br />0 Pass Fail <br />0 Pass Fail <br />© Pass Fail <br />Pass M Fail <br />Is there a sensor in the sump? <br />0 Yes ❑ No <br />0 Yes Cl No <br />® Yes ❑ No <br />0 Yes ❑ No <br />Does the sensor alarm when <br />either product or water is <br />detected? <br />❑ Yes ❑ No 0 NA <br />❑ Yes ❑ No N NA <br />❑ Yes ❑ No ® NA <br />❑ Yes ❑ No ® NA <br />Was sensor removed for testing? <br />0 Yes Cl No ❑ NA <br />0 Yes ❑ No ❑ NA <br />® Yes ❑ No ❑ NA <br />❑ Yes ❑ No 0 NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />®Yes ❑ No ❑ NA <br />®Yes ❑ No ❑ NA <br />SYes ❑ No ❑ NA <br />❑Yes ❑ No 0 NA <br />on repairs made <br />Sensor functionality was not confirmed. This procedure is not part of the Secondary Containment testing scope of work <br />Vent Sump Failed — Torn Boots, Penetration. <br />TOTAL P.10 <br />