Following agency approval the estimated time necessary to <br /> complete the tasks proposed in this workplan is 10 weeks. <br /> Following agency approval, the distribution of tasks aver <br /> .,� this time period is shown below. Actual time may vary <br /> depending on drill rig availability, laboratory turn-around <br /> and unforeseen circumstances. <br /> I'CEM W8EK <br /> t —_-----_---T,..—.`...,._--_—_---..__- --------._----- --5-- ------..,.',---8 -----------10 <br /> Agency Approval ! <br /> t <br /> � MobiliYet3on/?exmite """" <br /> a <br /> $ Lia <br /> i <br /> Soil Boring/ <br /> hall Installation <br /> surveying ! <br /> r R^ Soil Analysis <br /> Well Development/ <br /> ~~ Water Sampling <br /> 1 Water Analysis fRaRlaRafrR• <br /> � s <br /> Internal Review/ fwlaRfafRrRaaaaaea <br /> Report Preparation <br /> h e <br /> Report Submittal <br /> R <br /> �-- to Agency <br /> r <br /> r' <br /> 2 <br /> 4.0 REFERENCES <br /> 4 <br /> Hotchkiss, W.R. and Balding, G.O. 1971, Geology, Hydrology, <br /> and Water Quality of the Tracy-Dos Palos Area, San Joaquin <br /> Valley, California, USGS Open-File Report, 104 pp. 5 <br /> San Joaquin County Flood Control and water Conservation <br /> District, Fall, 1959, Semi-Annual Groundwater Report. <br /> 1 <br />