My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0010091
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
757
>
3500 - Local Oversight Program
>
PR0544462
>
ARCHIVED REPORTS XR0010091
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:04 AM
Creation date
5/16/2019 8:39:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010091
RECORD_ID
PR0544462
PE
3528
FACILITY_ID
FA0003551
FACILITY_NAME
B J J COMPANY INC
STREET_NUMBER
757
Direction
E
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
25026001
CURRENT_STATUS
02
SITE_LOCATION
757 E ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
{ <br /> i <br /> Soil samples will be collected at five foot intervals, at <br /> changes in lithology and intervals of obvious contamination <br /> in order to develop a complete profile of soil contamination. <br /> ✓ The soil samples shall not be composited. Soil borings will <br /> extend through the entire interval of contaminated soil and <br /> will terminate if saturated soil interval is encountered. <br /> r 2. Sample Collection During Tank Removal <br /> Soil samples will be collected as soon as possible after <br /> removal of the tank. Where feasible, all preparations for <br /> soil sampling will be made prior to tank removal. Soil, <br /> samples collected from a backhoe bucket or directly from the <br /> excavation floor will be collected in a thin-walled stainless ; <br /> steel or brass cylinder at least three inches long by one <br /> inch in diameter. From 3 to 24 inches of soil will be <br /> removed from the immediate surface area where the sample is <br /> to be taken and the cylinder then pounded into the soil with <br /> a wooden mallet, bulk density driver, or other decontaminated <br /> j driving device. No head space will be present in the <br /> cylinder once the sample is collected. Care will be taken to <br /> avoid contamination of both the inside and outside of the <br /> cylinder as well as its contents. During sampling, latex <br /> gloves will be worn to prevent cross contamination with other <br /> -� samples. One pair of disposable gloves will be dedicated <br /> to each sample collected. <br /> Once the sample is collected, each and of the cylinder will <br /> be covered with aluminum foil or teflon tape and then capped <br /> with a polyethylene lid, taped, and labeled. The sample will <br /> E then be individually sealed in a ziplock bag and immediately <br /> j placed in an ice chest containing dry ice or frozen "blue <br /> ice" for delivery to a state certified laboratory. Sample <br /> identification, storage and transportation will be conducted <br /> as outlined in the previous section. <br /> 3. Sampling from Soil Piles or Shallow Soil. Pits <br /> Soil samples will be collected and transported from excav-ted <br /> material in the manner described in the previous section, <br /> however, a backhoe will not be utilized. if composite <br /> ' samples are collected, four brass cylinders will be collected <br /> for every 50 cubic yards of material to be sampled unless <br /> otherwise specified by the lead regulatory agency. The <br /> I; samples will be composited by the state certified analytical <br /> laboratory personnel prior to testing. <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.