Laserfiche WebLink
1 ERM West Pumping test analysis Page 5 <br /> 1777 Botelho Dr Time-Drawdown plot Project Heinz,Tracy <br /> 1 Walnut Creek,CA <br /> (925)946-0455 Evaluated by BSB Date 318199 <br /> • Pumping Test No 1 Test conducted on 2113199 <br /> 1 MW-1 MW-1 <br /> 1 Static water level 0 00 ft below datum <br /> Pumping test duration Water level Drawdown <br /> 1 [min] IN 003 [ft] <br /> L – <br /> TOZ- 003 003 <br /> 103 755 003 003 <br /> --TO-4 <br /> M6- 795 U us 003106 815 003 003--TWI 875 003 --nu-r1fu- 835 003 003 <br /> 1 ' <br /> 1 <br /> li <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> • <br /> i <br /> I <br />