SEP-15-2003 69 : 17 AM PP =R, CEG 408 7396 P. 03 <br /> Well and Probe Installation Procedures <br /> The vapor extraction wells and vapor monitoring probes will be installed using hollowatem drilling methods. Each <br /> well or probe will be installed in a borehole to the depth shown. The wells will be installed under approved <br /> PHS E:HO permits and the work will be supervised by a registered geologist, <br /> The site has been logged and the site stratigraphy has been mapped. Sample lithologic logging will be <br /> performed to verify strata contacts to install the well slots at the desired depth interval. <br /> The boreholes will be advanced by drilling to the desired depth with pre-cleaned hollowstem augers. Augers, <br /> sampling tools and rods will be cleaned after each borehole and prior to leaving the site. Soil logging for <br /> contact verification will use the Unified Soil Classification System (USCS) using a split-spoon soil sampler <br /> advaneed at the desired depth. A geologist will leg the soil and retain samples as neekled. If 8011 samples <br /> are retained, they will be collected in clean brass liners completely driven to completely fill the liners in the sampler drive. <br /> The soil sample will be taken from the split-spoon, sealed with Teflon paper or foil, capped with plastic <br /> endplugs, logged onto a chain-of-custody form and packed of crashed ice for shipment of the laboratory. <br /> Each wail or probe will be constructed in the appropriate borehole The wells will use Schedule 80 PVC <br /> casing as shown. The casing will use threaded joints and glues will not be used. The casing will be cut to the <br /> length and threaded together and lowered into the hollowsfem augers. The slotted intervals will use 0.020 slots <br /> machine out at the factory. Once the casing is set, an aquarium sand pack will be placed around the casing <br /> annular space using the hollowstem sugar as a tfemie pipe. The sand pack will be placed to a point about 2-feet <br /> above the slotted interval. A bentonite Olay spacer will be placed atop the sand pack and hydrated prior to the <br /> cement grout placement to prevent grout invasion into the sand pack. A cement ground seal will then be placed atop <br /> the bentonite clay and raised to the surface from the bottom to the top of each borehole using the <br /> hollowstem augers as a tremis pipe. <br /> A traffic rated locking well vault box will complete each extraction well head and vapor probe access, <br /> The engineer will modify the box as needed to set the vapor sampling ports, magnsholix gauges and other equipment <br /> as needed for the vapor test and probe measurements and/or for further vapor extraction from the wells. <br /> Vapor Extractlon Well and <br /> vapor Probe specifications <br /> f'roj. No.:4233-3 <br /> Stafanos Oaskrlins Dimensions as shown <br /> 1419 Charter Way Dete: Sept.2003 <br /> Wright Environmental Sen4ces, Inc. Gtockton,CA <br /> Tracy, CA Figure 1 <br />