My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1419
>
3500 - Local Oversight Program
>
PR0544465
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2019 2:26:46 PM
Creation date
5/16/2019 11:29:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544465
PE
3528
FACILITY_ID
FA0005837
FACILITY_NAME
STEFANOS GASOLINE*
STREET_NUMBER
1419
Direction
E
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15137016
CURRENT_STATUS
02
SITE_LOCATION
1419 E CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
484
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mary L. Gardella 1991 Trust -2- February 25, 2000 <br /> Ramage Environmental Costs <br /> 1. Planning &permitting $3845 <br /> 2. Geophysical survey of former $2020 <br /> UST excavation <br /> 3. Sensitive receptor survey $620 <br /> 4. Groundwater monitoring well $8295 <br /> installation <br /> 5. Groundwater monitoring, $8400 <br /> sampling, analysis and reporting (6 <br /> wells for 4quarters) <br /> 6. Cone penetrometer test and $4840 <br /> Simulprobe deployment <br /> 7. Environmental site investigation $2160 <br /> report <br /> Sub-total Ramage Env. costs $30,180 <br /> TOTAL PRE-APPROVED $35,342 <br /> • The actual costs and scope of work performed must be consistent with the pre-approval for it to <br /> remain valid. <br /> • The work products must be acceptable to the County and the Regional Water Quality Control Board. <br /> • If a different scope of work becomes necessary,then you must request pre-approval of costs on the <br /> new scope of work. <br /> • Although I have referred to the Ramage Environmental proposal in my pre-approval above,please be <br /> aware that you will be entering into a private contract: the State of California cannot compel you to <br /> sign any specific contract. This letter pre-approves the costs presented in the proposals dated <br /> January 24&28, 2000 by Ramage Environmental and Wright Environmental for conducting the <br /> work approved by the County for implementing the December 13, 1999 Ramage Environmental <br /> workplan. <br /> I also want to remind you that the Fund's regulations require that you obtain at least three bids, or a bid <br /> waiver from Fund staff, from qualified firms for all necessary corrective action work. The legislation <br /> governing the Fund requires that the Fund assist you in procuring contractor and consultant services for <br /> corrective action. If you need assistance in contracting for corrective action services, don't hesitate to call <br /> me, <br /> California En vironmental Protection Agency <br /> %0 Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.