My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1419
>
3500 - Local Oversight Program
>
PR0544465
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2019 11:54:59 AM
Creation date
5/16/2019 11:30:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544465
PE
3528
FACILITY_ID
FA0005837
FACILITY_NAME
STEFANOS GASOLINE*
STREET_NUMBER
1419
Direction
E
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15137016
CURRENT_STATUS
02
SITE_LOCATION
1419 E CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k-w) <br /> Wright <br /> i EnvironmentalOr <br /> Services, Inc. <br /> R. Construction + Engineering • Remediation 03 JUN 30 If � `1 -A it <br /> a <br /> June 26, 2003 <br /> Project No. 4233-3 <br /> .Trust of Mary Gardella <br /> 525 2nd Street <br /> Santa Cruz, California 95060 <br /> Attn.: Ms. Winifred Alexander 4 <br /> Re: Monitoring Well Installation, Sampling and Assessment <br /> Addendum to Workplan Dated April 25, 2003 <br /> Stefano's Gasoline 1419 Charter Way, Stockton, CA <br /> l <br /> Dear Ms. Alexander, <br /> Wright Environmental Services, Inc. (Wright) has prepared this addendum workplan on behalf of <br />' Estate of Joe Gardella (owner) for the above referenced site. The proposed work is in response <br /> to a letter dated January 27, 2003 from the San Joaquin Public Health Services Environmental <br /> Health Division (PHS EHD) for additional monitoring well installations and site assessment. This <br /> work is being done to address petroleum contaminants on-site. Previous site assessment activities . <br /> have mapped portions of the dissolved plume and quarterly monitoring samplings with reports are <br /> ongoing at the site. The addendum was discussed in the meeting between Wright and PHS EHD <br /> representatives on May 22, 2003 and their letter dated June 2, 2003. <br /> Meeting of May 22, 2003 and Discussion of Workplan <br /> Wright and PHS EHD representatives discussed the April 25, 2003 workplan and the previous <br /> site work to date. The tanks were installed on the property in 1971 and the leak appears to center <br /> on the former tank pit. Groundwater levels in the area may have been up to 30 feet deeper than <br /> E, present day, a condition that would have enhanced vertical contaminant penetration in years prior ` <br /> to the more recent groundwater "rebound" and water levels rising in the area. PHS EHD was in <br /> general agreement with the workplan but indicated concerns regarding,the nature of the site <br /> stratigraphy and contaminant pathways for all contaminants, especially 1,.2-Dichlorethane (1, 2- <br /> DCA). Currently, three water bearing zones of interest occur at about 35'50 feet, 60-65 feet and <br /> 110-119 feet have been identified. The largest area of petroleum contaminant appears within the <br /> 35-50 foot aquifer zone (roughly the area of MW-2), with scattered occurrences laterally in the <br /> deeper zones. ` <br /> 67 . 10th Street Tracy, CA 95.376 Page ] of 6 <br />+` 209.333.0758 • Fax 209.832.5152 <br /> wrighi@inreach.com Lie. #651501 A-B HazMat, C21 �I►� <br /> websit htip://wri_zhtenvironmentalservices.com j UI <br />
The URL can be used to link to this page
Your browser does not support the video tag.