My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1419
>
3500 - Local Oversight Program
>
PR0544465
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2019 11:54:59 AM
Creation date
5/16/2019 11:30:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544465
PE
3528
FACILITY_ID
FA0005837
FACILITY_NAME
STEFANOS GASOLINE*
STREET_NUMBER
1419
Direction
E
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15137016
CURRENT_STATUS
02
SITE_LOCATION
1419 E CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page S td <br /> Trust of <br /> Mary Ci:ardella <br /> June 26, 2003 _ r�" 61� <br /> " • The interim cleanup approach using'a KVA C-Sparer o7or1e generator and bubbler will be <br /> prepared with a proposed location initially within the most '`heavily" contacted :area in <br /> the 35-50 foot depth. <br /> • Wright proposes drilling one boring for the bubbler well into a.location interpreted t--- have <br /> the higbes-t observed contaminants (possibly near and SlightlY doWn radi <br /> ezt of C.�dsliri <br /> monitoring well MW-2). This .location appears most heavily contaminated and 'hence <br /> would be the area of highest priority on the basis of the currently available upper ;nluifer <br /> (well slotted at 30-50 feet) and well data. <br /> • The bubbler apparatus would be installed in the borchole and operated ibr an initial period <br /> of SLN months to evaluate the performance of this approach over a t:wo-quarter per,ad for <br /> reduction of TFHG, Benzene and L27DCA concentrations. <br /> Wright will inc;orpora;tt- ties addendum site characterizztion and interim clean. �, <br /> ti wore. and fi. din s <br /> into the report of this site investigation for submittal to PHS EHD as outlined in the ,AF ril 25, <br /> 2003 workplan. Additional discussions and meetings as ncuded willbe scheduled to <br /> i�GUS4 <br /> results as the project moves forward. <br /> If you have any questions please call. <br /> Sincerely, E G <br /> �r �. F <br /> right Environmental Services, Inc. <br /> M 1262 c <br /> CERTIM <br /> E1lfGli�f f�� <br /> ?ohhn Lynch Christopher M. katnner 6EMM <br /> President C. E. G. 1262 <br /> OF <br /> Attachments: Figure 1. Proposed Exploratory CPT Boring Locations <br /> r <br /> f <br /> i4 <br /> Page-5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.