Laserfiche WebLink
xF y <br /> WORK REQUEST FORM <br /> (Woolsey/Charter Way) <br /> Date of Request: 05/19/00 Requested Completion Date:05/23/00 <br /> Proj Name: Woolsey/Charter Way _ Prol No: 294 <br /> Site Address:_1501 W. Charter Way, Stockton, CA Task: none <br /> Project Manager: Greg Stahl Field Personnel: Scoma <br /> I <br /> I <br /> Client Contact: Jim Lancaster Phone No: 948-9412, ext. 18 <br /> Regulatory Contact: Mike Infurna Phone No: 468-3454 <br /> Site Phone: 941-4934 (South Bay Tire) <br /> Approval: _ Completion Date: Os agJov _4 S e_n <br /> READ AND UNDERSTAND PRIOR TO LEAVING FOR SITE <br /> Quarterly groundwater monitoring and sampling <br /> 041 <br /> • Notifynfur�a and Jim Lancaster prior to conducting field work <br /> • Monitor DTW and DTB in three wells in order Order is MW2, MWI, MW3 MWI and <br /> MW2 are non-detect MW3 is hot <br /> • Wells are 2" diameter, 30 feet deep Water should be at about 15 feet <br /> • Purge and sample wells in order Should be able to use centrifugal pump at around 1 5 gpm <br /> • Sample for TPHd/TPHg/BTEX/MTBE (by 8020) Samples to Argon, standard turnaround <br /> • Contain purge water Drum MW3 separately from MWI and MW2 Can combine <br /> MWI/MW2 Make sure you properly label drums <br /> • You can dump and reuse drums from MWI and MW2 from last sampling round Don't dump <br /> drum from MW3 <br /> • Use very good QC <br /> • Do accurate drum count <br /> • Resurvey wellheads to confirm elevations <br /> I <br />