Laserfiche WebLink
v <br /> Ms. Diane Hinson - 2 - 29 August 1989 <br /> permits as soon as possible. However, experience has shown that ground water <br /> contamination problems of this type are not solved rapidly, and often require <br /> several phases of investigation before an appropriate remediation system can <br /> be proposed. <br /> We recommend that the proposal to install the additional wells be approved, <br /> provided that it is understood that additional investigation will be necessary <br /> to adequately characterize the nature and extent of the contamination prior to <br /> developing a remedial action plan. <br /> If you should have any questions, please call me at (916) 361-5731 . <br /> THOMAS D. PELTIER <br /> Engineering Geologist <br /> TDP/tdp <br />