Laserfiche WebLink
AUG 1G, '39 12: 11 BIO f`IH�TI qL CORP. '�` P.N.'S <br /> (C) 19'f39 BIO NATIONAL CORI'Ot�ATIQN <br /> )Rio NATIONAL CORPO"i TION <br /> 4609-7 New Horizon blvd. <br /> Bakersfield, CA 93313 <br /> (805)833-1145 <br /> PAX 833-3537 <br /> HOLT BROS. FINAL ANALYTICAL LAND 'REMEDIALOUTLINE <br /> 1521 W. Charter W'y <br /> Stockton, San Joaquin CountfY, CA 9520E <br /> August 16, 1989 <br /> r request of Diane Hinson, REBS, Sari Joaquui tl <br /> Forced to the following per q <br /> County for information purposes, <br /> Diane lfinson, San Joaquin County Health Services <br /> Ben Sm�arkel, Ph.D., DQHS/Alternativ'e Technology <br /> Tarn Peltier, RW$CB, Region 5 <br /> Al Nielsen, Halt Bros. <br /> pri liter analysis has shown that after removal of the seven underground <br /> storage tanks on thii�a property, four monitor weU installations reveled <br /> In addition►, <br /> groundwater impact with gasoline and Ghl.oriraa�d hydrocarbons. <br /> son contamination in the <br /> there is petroleum and chlorinated hy'dr°oca hon sail Banta <br /> vicinity of MW-1. <br /> A Sail. Gw Analysis revealed an approximate Emit to the contamination, from <br /> which a final. site assessment Work Plan is bei -'I prepared. <br /> This final site assessment work plan include an initial treatment pragrals <br /> 1. Tank treatment of cuttings and well development water's as a test i <br /> 'base. <br /> 2. <br /> The beginning of groundwater extraction for surface treatment <br /> and./or disposal. <br /> 3d Projects a request for approval df $ modified vapor e�draction � <br /> procedure for soil Mitigation, once all the site parameters are � <br /> { <br /> defined. <br /> 1 <br /> 1 HOLTS06 <br /> _ II <br />