Laserfiche WebLink
qtr. -ub 95(WED) 15:05 HOLT BRfis. TEL:209 4b7. 4b58 <br /> tOS. 4t P- 002 <br /> -FOO114ILL <br /> Qe �C) � -� <br /> D <br /> 12793 P DY cvDi CA c. <br /> PH.C2M 368-9381 FAX 36�'-7163 �r0 <br /> Mr. Al Kroger August 31, 1995 <br /> Holt Bros. Inc. <br /> P.O.Box 8130 <br /> Stockton, CA 95208-0I06 <br /> RE: Proposal for Remediation of Petroleum Hydrocarbon Soil-Holt Bros.Facility <br /> Dear Mr. Kroger, <br /> Foothill Engineering, in association with Jim Thorpe Oil, has prepared this proposal for soil <br /> remediation at the Stockton facility.This proposal is broken down into the various items of work for <br /> project completion.Each item has an estimated unit quantity of work and a total estimated value of <br /> the completed project. The final contract amount will be determined by the volume of work <br /> perfor nerl for each item multiplied by the unit price. In other words,if 4000 CY are excavated,Holt <br /> Bros.will only be invoiced for 4000 CY at the contract unit price_ <br /> PROPOSED WORK PLAN <br /> We propose that the work be perr(brmed in two sections, so as to keep access to the Holt Bros. <br /> maintenance area.Each section will be excavated to the full desired depth and tested as required by <br /> PHSIEIID.Atter test results are rerreived and approved by PHSMM, each section will be backfilled <br /> to subgrade and the aggregate base will placed to the required grade. After both sections are <br /> completed through the aggregate base,both sections will then be paved with the required eight inches <br /> of concrete surfacing. Depending on the final limits of work,this plan should keep access available <br /> to the maintenance shops during all phases of construction_ Please refer to the attached schedule for <br /> details of the work plan_ <br /> BID PRICE SCHEDULE <br /> Item 1Descri 'on Units Volume Unit Price Estimated Total <br /> Saw Concrete LF 400 LF $6.50/LF $2600 <br /> Remove Concrete SF 9640 SF SLOMF $9600 <br /> Replace Concrete SF 9600 SF $4.85/SF $46560 <br /> Replace Wells EA 2 EA $640/EA $1200 <br /> Excavation CY 5000 CY $3.00/CY $15000 <br /> Imported Fill CY 5000 CY $12.00/CY $60000 <br /> Place Fill CY 5000 CY $3.501CY $17500 <br /> Soil Testing EA 40 EA $200/CY $8000 <br /> Reports LS I LS $3500 53300 <br /> Fend mg LS 1 LS N/C NIC <br /> Mobilization EA 1 EA $1000)EA 51000 <br /> TOTAL ESTIMATED BID PRICE 5164960 <br />