My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1521
>
3500 - Local Oversight Program
>
PR0544466
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2019 3:38:58 PM
Creation date
5/16/2019 2:51:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544466
PE
3528
FACILITY_ID
FA0005303
FACILITY_NAME
HOLT OF CALIFORNIA
STREET_NUMBER
1521
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16337015
CURRENT_STATUS
02
SITE_LOCATION
1521 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JI it`! '91 TUE 11:49 -r.r):Sj C.0Li <br /> P H_THJC:S TEL rar: ��°a�^ 8525 #936 P05 <br /> _.. <br /> S <br /> a <br /> STATE OF CALIFORNIA <br /> FETE WIIS01y.00'.w r <br /> STATE WA'fFt RESOURCES CONTROL BOARD <br /> DIVISION OP CLEAN WATER PROGRAMS <br /> 2014 T STREET,SUITE 130 <br /> P.O.BOX 944212 . <br /> SACRAMENTO,CA 94244.2120 <br /> (9I6) 739-2300 FAX I /ie[] 2,A-, �cz�j <br /> play 8, 1991 <br /> Responsible Parties, San Joaquin County <br /> COST RECOVERY FOR OVERSIGHT OF LEAKING UNDERGROI)ND STORAGE TANK {UST}CLEANUP <br /> When the local agency included your site in the local oversight program(formerly <br /> pilot program) for leaking UST cleanup, you received a letter explaining that the <br /> State Water Resources Control Board (State Board) would bill you for public costs <br /> of cleanup oversight. Enclosed is a bill for local and Regional Water Quality <br /> Control Board (Regional Board) supervision of cleanup at the site listed in the <br /> enclosed bill. You will be billed at a future date for State Board program <br /> management. <br /> The enclosed bill includes both site specific an program management charges. <br /> Site specific charges represent those charges far work done that is directly <br /> related to your site. Examples of such activities include sampling for soil or <br /> gr66nd water contamination, conducting site inspections, reviewing reports and <br /> workplans, or preparing correspondence. Activitiies performed for your site are <br /> itemized on the bill. A description of ractivity,; codes is included on the reverse <br /> side of this letter for your reference. <br /> The enclosed invoice charges for the billing period April 1, 1990 through <br /> June 30, 1990. If you received an invoice for carges for a previous billing <br /> period, the charges for that period are shownas "Previous Balance." Any payment <br /> you made on the previous billing is shown as "Pa ent Received." The total of <br /> any unpaid previous balance plus new charges is ' hown as "Total Amount Due." <br /> Program management charges include all other costs associated with initiating and <br /> maintaining program operations. Program management charges may include such <br /> costs as: space rental , office services and supplies, purchase of sampling <br /> equipment, training costs, and the salary and benefits of support personnel <br /> (i.e_ , clerical staff, accountant, program superrisor) . Program management <br /> charges also include Regional Board work. <br /> Your share of program management charges depends on how much site-specific time <br /> was charged to your site, compared with all site specific time charged by the <br /> local agency. For example, if 10 hours were changed to your site, and 1,000 <br /> hours were charged to all sites, then your share of program management costs <br /> would be 10 divided by 1,000 or one percent. <br /> SII <br />
The URL can be used to link to this page
Your browser does not support the video tag.