My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOCKEFORD
>
681
>
2900 - Site Mitigation Program
>
PR0505449
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 10:12:09 AM
Creation date
5/16/2019 2:56:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505449
PE
2953
FACILITY_ID
FA0006730
FACILITY_NAME
CLAUDE C WOOD CO
STREET_NUMBER
681
Direction
E
STREET_NAME
LOCKEFORD
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04905002
CURRENT_STATUS
02
SITE_LOCATION
681 E LOCKEFORD ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
AMeuangkhoth
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Soil samples will then be collected to confirm the success of the excavation activities. The <br />number and location of confirmatory samples will be determined in concurrence with the <br />San Joaquin County EHD. Sampling will be performed by persons under the supervision <br />of a State Registered Geologist following established sampling protocol. Soil samples will <br />be analysed at a state certified laboratory for TPHD. <br />Once confirmatory sampling has indicated that the site has been sufficiently remediated the <br />excavation will be backfilled with imported engineered backfill materials suitable to <br />achieve greater than 90% relative compaction. <br />The contaminated soils stockpiled on site will then be prepared for bioremediation or off- <br />site disposal whichever is deemed the most cost effective. Non -bioremediated soils will be <br />removed to an appropriately approved off-site disposal facility after stockpile sampling <br />necessary for proper characterization has been completed. <br />A final report documenting and summarizing all remediation activities will be submitted to <br />San Joaquin County Environmental Health Department within 90 days of completion of all <br />on site work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.