Laserfiche WebLink
5.0 � <br /> We will commence work immediately upon receiving your authorization to <br /> proceed. The field work should be 4:10,00:3ted within two weeks after <br /> obtaining all necesriry regulatory permits (weather and drill rig <br /> aaailability permitting), with chemical aualvsis results available three to <br /> six weeks Istor. Our letter report will be completed appro-timsttbiy two F <br /> weeks after receiving test results. <br /> -.3 <br /> . f <br /> e <br /> ib t i <br /> ll <br /> RIi01.005 $ November 29, 1988 <br /> b <br /> r <br />