6.0 SCHEDULE <br /> Dames & Moore proposes to initiate the phase II site <br /> Investigation upon approval from the San Joaquin Local Health <br /> District. We anticipate that the monitoring well installation and <br /> sampling could be completed within one week following mobilization <br /> to the site. Sample results and investigation memos will be <br /> summarized iii. report format approximately six weeks foll'o*ing <br /> monitoring wail installation. <br /> —000— <br /> Figures 1 to 4 and ?ippendiX A are attached to campZeLe this <br /> work plan. <br /> 1 <br /> { <br /> i . <br /> r <br /> i <br /> LD01.064 <br /> Zti <br /> mom rim <br /> f, <br /> rl <br /> a <br />