Laserfiche WebLink
' TABLE OF CONTENTS <br /> (continued) <br /> TABLES <br /> Table 1 Summary of Tank Removal Soil Analytical Results -Hydrocarbon Analytes <br /> Table 2 Summary of Tank Removal Soil Analytical Results -Halogenated Volatile Organics <br /> Table 3 Summary of Soil Analytical Results <br /> Table 4 Summary of Groundwater Monitoring Data <br />' Table S Summary of Groundwater Analytical Results - Hydrocarbon Analytes <br /> Table 6 Summary of Groundwater Analytical Results - Halogenated Volatile Organics <br />' Table 7 Summary of Excavation Soil Confirmation Samples <br /> FIGURES <br /> Figure 1 Site Location Map <br /> Figure 2 Former Tank Locations <br /> Figure 3 Soil Borings and Monitoring Wells <br /> Figure 4 Estimated Extent of Contamination and Limits of Excavation <br /> Figure S Groundwater Gradient Map (December 6, 1996) <br /> APPENDICES <br /> Appendix A Groundwater Monitoring Well Construction Logs <br /> Appendix B Calculations of Mass of Contamination in Soil <br /> Appendix C Well Survey Location Map <br /> 1 <br /> • <br /> o <br /> r <br />