My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1805
>
2900 - Site Mitigation Program
>
PR0544467
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2019 4:17:17 PM
Creation date
5/16/2019 4:09:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544467
PE
2959
FACILITY_ID
FA0009741
FACILITY_NAME
EL DORADO CHEMICAL CO INC
STREET_NUMBER
1805
Direction
E
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15514007
CURRENT_STATUS
02
SITE_LOCATION
1805 E CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CP - PAGE THREE • • <br /> AND BY AN INDEPENDENT REGISTERED PROFESSIONAL ENGINEER AS APPROVED IN <br /> THE CLOSURE PLAN. THE CERTIFICATION SHALL INCLUDE A DESCRIPTION OF <br /> SAMPLING METHODOLOGY, ,SAMPLE LOCATIONS, ANALYTICAL RESULTS ( INCLUDING <br /> QUALITY CONTROL AND QUALITY ASSURANCE ), SAMPLE CHAIN OF CUSTODY LOGS, <br /> FIELD MEASUREMENTS, WASTE MANIFEST COPIES AND PROOF OF RECEIPT FROM A <br /> PROPERLY LICENSED DISPOSAL FACILITY ( DISPOSAL RECORDS ), PHOTOGRAPHS <br /> AND ADDITIONAL SUPPORTING DOCUMENTATION AS APPROPIATE. A DESCRIPTION OF <br /> THE WORK PERFORMED AND ANALYTICAL RESULTS FROM THE TANK DECOMMISSIONING <br /> AND PARTIAL PIPELINE REMOVAL PERFORMED IN MAY, 1987 SHALL ALSO BE INCLUDED. <br /> ( CFR 265,115 ) <br /> (14) THIS CLOSURE PLAN ASSUMES. THERE IS MINIMAL TO MODERATE SOIL CONTAMINATION <br /> AND NO GROUNDWATER CONTAMINATION. IF, DURING EXCAVATION, IT IS DISCOVERED <br /> THAT SOIL CONTAMINATION IS EXTENSIVE, GROUNDWATER CONTAMINATION IS HIGHLY <br /> SUSPECTED AND THAT THE TANK AND OR PIPELINE IS THE PROXIMATE CAUSE, ELDORADO <br /> CHEMICAL CO., INC. WILL BE REQUIRED TO SUBMIT A PLAN FOR ADDITIONAL SAMPLING <br /> AND REMEDIATION OF THE CONTAMINATION CAUSED BY ELDORADO CHEMICAL CO., INC. <br /> ( CFR 265.197 ) <br /> (15) DURING THE CLOSURE PROCESS, ELDORADO CHEMICAL CO., INC. SHALL CAUSE SAMPLES <br /> TO BE COLLECTED AND SUBMIT THEM TO A CERTIFIED LABORATORY FOR THE ANALYSIS <br /> ACCORDING TO THE MATRIX IN FIGURE I AT THE LOCATIONS SHOWN IN FIGURE 2. <br /> THE SAMPLE ANALYSIS SCHEDULE PLAN ( ENCLOSURE 2 ) AS APPROVED, SHALL BE <br /> USED. IHE SAMPLE ANALYSIS SCHEDULE PROPOSED IN THE DRAFT OF 26 APRIL, 1989, <br /> CP SHALL NOT BE USED. c CFR 265.112 (B) (4) ) <br /> IHANKYOU FOR YOUR CONTINUED ASSISTANCE AND COOPERATION AND WE LOOK FORWARD <br /> TO YOUR COMMENTS TOWARD THIS CLOSURE, <br /> VERY TRULY YOURS, <br /> JAMES J. HOBLITZELL IV <br /> VICE PRESIDENT AND ENVIRONMENTAL MANAGER <br /> REPRESENTING ELDORADO CHEMICAL CO., INC. <br /> ATTENTION: MESSRS. JOE R. FREDICKSEN, <br /> PRESIDENT, PAT E. SMITH, VICE PRESIDENT <br /> N.O. DRAWER 54837 <br /> ,IJH/NB (512) 653 TEXAS <br /> (512)65370825 <br /> FILE:JH-12/1545 <br /> CC: DISTRIBUTION LIST <br />
The URL can be used to link to this page
Your browser does not support the video tag.