Laserfiche WebLink
CP - PAGE TWO • • <br /> (3) EQUIPMENT DECONTAMINATION PROCEDURES PLAN, ( ENCLOSURE 3.) ( CFR 265.112 <br /> (B) (4) ) . <br /> (4) REVISED CLOSURE COST ESTIMATE REFLECTING CP MODIFICATIONS ( ENCLOSURE 4 ) <br /> ( CFR 265.142 ). <br /> (5) ESTIMATE OF VOLUMES OF WASTE AND DISPOSAL PROCEDURES INCLUDING INFORMATION <br /> REGARDING THE PROPOSED AND ALTERNATE TSD FACILITIES WITH DISTANCES TO <br /> EACH FACILITY ( ENCLOSURE 5 ) . ( CFR 265.111 (B) (3) ) <br /> (6) EXCAVATED WASTE STORAGE PLAN INCLUDING PROCEDURES TO PREVENT CONTACT <br /> WITH CONTAMINATED SOIL, WIND DISPERSAL, RAIN WATER RUN ON AND RAIN <br /> WATER RUN OFF. ( ENCLOSURE 6 ) ( CFR 265.112 (B) (3) ) <br /> (7) SCHEDULE OF SITE INSPECTIONS BY CERTIFYING ENGINEER DURING CLOSURE. <br /> ( ENCLOSURE 7 ) ( CFR 265.115 ) <br /> (8) TOPOGRAPHIC MAP OF FACILITY AND SURROUNDING AREA. ( ENCLOSURE 8 ) <br /> ( CFR 265.112 (B) ) <br /> (9) EQUIPMENT SCHEDULE FOR EXCAVATION, TANK, PIPELINE AND CONTAMINATED SOIL. <br /> ( ENCLOSURE 9 ) ( CFR 265.112 (B) (3) ) <br /> (10) ELDORADO CHEMICAL CO., INC. IS NOT AWARE OF ANY FUTURE INTENDED USE <br /> OF THE AREA AFFECTED BY CLOSURE. IHE PROPERTY IS OWNED BY; <br /> RENTAL MACHINERY COMPANY <br /> P.O. Box 8098 <br /> STOCKTONCALIFORNIA 95208 <br /> (209) PViR. STANLEY I"WRE, OWNER <br /> ( CFR 265.111 ) <br /> (11 )ELDORADO CHEMICAL CO., INC. SHALL PLACE OVERBURDEN FROM THE PIPE REMOVAL <br /> DOWN TO SIX (6) INCHES ABOVE THE PIPE IN A SEPARATE STORAGE PILE OR <br /> CONTAINER...THIS MATERIAL MAY BE USED FOR BACKFILL ONLY IF SUITABILITY <br /> IS DEMONSTRATED THROUGH SAMPLING AND ANALYSIS. ( CFR 265.111 ) <br /> (12) ALL PIPES AMID SOIL FROM SIX (6) INCHES ABOVE THE PIPE TO THE DEEPEST <br /> PART OF THE EXCAVATION SHALL BE HANDLED AND DISPOSED OF AS HAZARDOUS <br /> WASTE UNLESS ELDORADO CHEMICAL CO., INC. CAN DEMONSTRATE THAT THE <br /> MATERIAL IS NOT HAZARDOUS. ( CFR 265.111 ) <br /> (13) WITHIN SIXTY (60) DAYS OF COMPLETION OF THE CLOSURE, ELDORADO CHEMICAL <br /> CO., INC. SHALL SUBMIT TO DHS A CERTIFICATION THAT THE TANK AND ASSOCIATED <br /> PIPING HAVE BEEN CLOSED IN ACCORDANCE WITH THE SPECIFICATIONS IN THE <br /> APPROVED CLOSURE PLAN. THE CERTIFICATION SHALL BE SIGNED BY THE OWNER <br /> OF ELDORADO CHEMICAL CO., INC. OR AN AUTHORIZED OFFICER OF THE CORPORATION <br />