My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1821
>
2900 - Site Mitigation Program
>
PR0009048
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2019 4:41:16 PM
Creation date
5/16/2019 4:32:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009048
PE
2960
FACILITY_ID
FA0004083
FACILITY_NAME
CCJS (LEASED PROPERTY)
STREET_NUMBER
1821
Direction
E
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95208
APN
15514015
CURRENT_STATUS
01
SITE_LOCATION
1821 E CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RE-MANUFACTURING SAMPLE LOCATIONS, <br /> 5/3/91 AND 5/7/91 INSPECTIONS <br /> DATE SAMPLE I .D. LOCATION <br /> 5/3/91 FS-5* Southeast corner of SI, 5 feet into sidewall . <br /> LT-1* 1 foot below the top of the north levee of SI. <br /> KT-5* 5 feet below top of levee, NW corner of SI . <br /> JEM-SE-2* Same as SE-2. 2 feet below floor of SI, southeast corner. <br /> JEM5391-1 Center of east SI sidewall , roughly 1 foot below the surface, roughly <br /> 4 feet below top of levee. <br /> JEM5391-2 Halfway up western sidewall of SI, center of wall , roughly 6 to 8 <br /> inches below the surface. <br /> JEM5391-3 4 to 6 inches below ground surface in fill area east of SI. <br /> JEM5391-4 Soil pile west of SI. South side of pile, roughly 6 inches below the <br /> surface of the pile and 2 feet above grade. <br /> JEM5391-5 North wall of SI, up sidewall from location SE-2. Roughly 1/2 way <br /> up sidewall and 1 to 2 inches below the surface. <br /> 5/7/91 JEM5791-1 Center of Mormon Slough, upstream of SI, south of bridge, 3 feet <br /> downstream of Water Work sample location. <br /> JEM5791-2 Northern edge of slough, upstream of SI, beneath power lines. <br /> JEM5791-3 In slough, upstream of SI, directly beneath 36 inch culvert. <br /> JEM5791-4 Roughly 6 feet upstream of fence surrounding SI, beneath drainage <br /> outlet. <br /> JEM5791-5 Sidewall of slough, roughly 50 feet upstream of SI, roughly 1 1/2 <br /> feet up sidewall from bottom of slough. (Slough floor was organic <br /> material .) <br /> JEM5791-6 Base of north bank of slough, halfway along surface impoundment. <br /> JEM5791-7 Roughly 15 feet downstream of SI, bottom of slough. <br /> JEM5791-8 In slough, downstream of SI, roughly 100 feet west of road (Bieghle <br /> Al . ) . <br /> JEM5791-9 East of sewer manhole, near west end of building. <br /> JEM5791-10 25 feet east of sewer manhole, bottom of north bank of slough. <br /> JEM5791-11 Bottom of drainage channel , east of surface impoundment. <br /> * = Split samples. Sample locations surveyed by Re-Manufacturing. <br /> All 5/7/91 samples were collected roughly 2 to 4 inches below ground surface. <br />
The URL can be used to link to this page
Your browser does not support the video tag.