My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1904
>
2900 - Site Mitigation Program
>
PR0505548
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 9:06:51 AM
Creation date
5/17/2019 9:01:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505548
PE
2960
FACILITY_ID
FA0006852
FACILITY_NAME
OCCIDENTAL CHEMICAL CORP
STREET_NUMBER
1904
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
16302041
CURRENT_STATUS
01
SITE_LOCATION
1904 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEOMATRIX <br /> • Total Kjeldahl Nitrogen (TKN)- EPA Method 351.3 <br /> • General Minerals—Various EPA Methods <br /> In accordance with the SAP, travel blanks will be analyzed for VOCs only. <br /> 3.7 Reporting <br /> ' After field activities have been completed and analytical results have been received, a report will be <br /> prepared that presents the results of the additional groundwater investigation at the Facility and vicinity. <br /> The report will contain a map showing the surveyed locations of the exploration borings and monitoring <br /> ' wells, lithologic boring logs, geophysical logs, and laboratory analytical data. The report will contain <br /> an evaluation of background groundwater quality, an estimate of the vertical and lateral extent of <br /> ' chemicals in groundwater based on the available data, and recommendations for additional groundwater <br /> assessment activities, if necessary. <br /> ' 4.0 SCHEDULE <br /> The additional groundwater investigation described in Sections 3.1 through 3.5 of this work plan can be <br /> ' initiated within 2 weeks after obtaining access permission from the property owners, receiving RWQCB <br /> approval of this work plan, and obtaining subsurface assessment permits from the SJC-EHD. The field <br /> activities described above will require approximately nine weeks to complete. Laboratory analysis of <br /> groundwater samples and data validation will require an additional six to eight weeks. Evaluation of the <br /> analytical data and preparation of the report will require approximately six weeks to complete. <br /> The groundwater monitoring discussed in Section 3.6 will be conducted during the first regularly <br /> ' scheduled trimesterly monitoring event after completion of the new monitoring wells. The monitoring <br /> data will be summarized in the regularly scheduled monitoring report for the monitoring event. <br /> 1 <br /> 1 <br /> 1 <br /> :maorerncesroocunuzmasss�ao12 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.