My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1904
>
2900 - Site Mitigation Program
>
PR0505548
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 9:06:51 AM
Creation date
5/17/2019 9:01:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505548
PE
2960
FACILITY_ID
FA0006852
FACILITY_NAME
OCCIDENTAL CHEMICAL CORP
STREET_NUMBER
1904
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
16302041
CURRENT_STATUS
01
SITE_LOCATION
1904 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' surface. However, organic drilling fluid additives will only be used with prior project GEOMATRIX <br /> manager approval. The drilling mud will be circulated into a settling tank or basin located <br /> ' near the boring. The viscosity of the drilling fluid will be assessed periodically by the driller <br /> and will be controlled throughout the drilling operation to achieve the required results (hole <br /> ' stability, sample return, and mud cake thickness along borehole wall). Only potable water will <br /> ' be used as makeup water for drilling fluid. Exploratory borings drilled using the hollow stem <br /> auger method generally do not require the use of drilling fluid. If required, potable water <br /> ' from a municipal supply will be used to maintain boring stability. <br /> ' The planned depth of each soil boring will be determined by the project manager before <br /> drilling. The Geomatrix field geologistiengineer will specify to the drill rig operator the depth <br /> ' of soil sample collection, method of sample retrieval, and other matters pertaining to the <br /> satisfactory completion of the borings. Geomatrix staff will observe the volume of drill <br /> ' cuttings returned to assess whether significant cavitation has occurred. Drill cuttings, unused <br /> soil samples, and drilling fluids generated during drilling of soil borings will be stored <br /> ' properly for future disposal by the client, unless other arrangements have been trade. <br /> ' The drill rods, augers, hoses, bits, and other components that fluids and cuttings contact will <br /> ' be steam-cleaned before drilling each boring, as well as at the beginning of each project and at <br /> the completion of field activities. Drive samplers will be cleaned with Alconox and water or <br /> steam-cleaned before each sampling event. Only potable water from a municipal supply will <br /> be used for decontamination of drilling equipment. Decontamination rinsate will be collected <br /> ' and stored properly for future disposal by the client. unless other arrangements have been <br /> made. <br /> DRILLING .SND DESTRUCTION OF SOIL 3ORINGS <br /> `.(SC?ROTO-DD.TNT REVTSION DAT': '.1ARCH 14-'I DD-1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.