My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1904
>
2900 - Site Mitigation Program
>
PR0505548
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 9:06:51 AM
Creation date
5/17/2019 9:01:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505548
PE
2960
FACILITY_ID
FA0006852
FACILITY_NAME
OCCIDENTAL CHEMICAL CORP
STREET_NUMBER
1904
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
16302041
CURRENT_STATUS
01
SITE_LOCATION
1904 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEOMATRIX <br /> PROTOCOL <br /> INSTALLATION AND DESTRUCTION OF WELLS <br /> ' 1.0 INTRODUCTION <br /> ' This protocol describes the procedures to be followed during the installation or destruction of <br /> monitoring, groundwater extraction, and vapor extraction wells. Drilling and logging of soil <br /> ' borings for the well installation will be in conformance with the protocol DRILLING OF <br /> SOIL BORINGS. The procedures presented herein are intended to be of general use and may <br /> ' be supplemented by a work plan and/or health and safety plan. As the work progresses and if <br /> warranted, appropriate revisions may be made by the project manager. Detailed procedures in <br /> this protocol may be superseded by applicable regulatory requirements. <br /> ' 2.0 WELL INSTALLATION <br /> A DAILY FIELD RECORD will be completed for each day of fieldwork, and the original will <br /> be kept in the project files. If required, permits will be acquired from the appropriate <br /> agency(s), and an underground utility check will be performed before drilling begins. An <br /> ' underground utility check will, at a minimum, consist of contacting a local utility alert service, <br /> if available. <br /> ' After well installation, well completion report(s) will be completed and filed with the State <br /> ' Department of Water Resources or the appropriate agency. <br /> ' Each groundwater monitoring well will be designed to enable measurement of the potentio- <br /> metric surface and to permit water sampling of a specific water-bearing zone. Each vapor <br /> ' monitoring well will be designed to enable measurement of pressure conditions and permit <br /> ' sampling of a specific zone. The field geologist/engineer, in consultation with the project <br /> geologist or engineer, who will be licensed in the state in which the work is performed if <br /> ' required, will specify the screened interval using the lithologic log and geophysical log (if <br /> INSTALLATION AND DESTRUCTION OF WELLS Page 1 of 8 <br /> ' MSC\PROTO-IW.TXT REVISION DATE:MARCH 1996 IW-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.