My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1904
>
2900 - Site Mitigation Program
>
PR0505548
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 9:06:51 AM
Creation date
5/17/2019 9:01:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505548
PE
2960
FACILITY_ID
FA0006852
FACILITY_NAME
OCCIDENTAL CHEMICAL CORP
STREET_NUMBER
1904
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
16302041
CURRENT_STATUS
01
SITE_LOCATION
1904 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEOMATRIX <br /> 2.6 DOCUMENTATION <br /> A well construction diagram for each well will be completed in the field on the WELL LOG <br /> ' by the field geologist/engineer and submitted to the reviewing geologist or engineer upon <br /> completion of each well. Well installation and construction data will be summarized on the <br /> ' DAILY FIELD RECORD or on a specialized form produced for this purpose. Well develop- <br /> ment notes and field measurements of water quality parameters will be summarized on a <br /> ' WELL SAMPLING AND/OR DEVELOPMENT RECORD. Following review by the project <br /> manager, the original records will be kept in the project file. <br /> 3.0 CLEANING OF DRILLING EQUIPMENT <br /> 1 <br /> ' Cleaning of the drill rig and associated drilling equipment will follow the procedures discussed <br /> in Section 2.0 of the protocol DRILLING AND DESTRUCTION OF SOIL BORINGS. <br /> ' All well casing materials will be cleaned before they are installed. Well development <br /> ' equipment will be cleaned before use. The following cleaning procedure has been found to be <br /> effective and will be used or adapted as appropriate for general conditions of materials or <br /> ' equipment to be cleaned. <br /> 1. Steam-rinse with potable water or rinse in deionized or organic-free water. <br /> ' 2. Cover with clean plastic to protect materials and equipment from contact with <br /> chemical products, dust, or other contaminants. <br /> ' Alternatively, well casing materials that have been steam-cleaned and sealed in individual <br /> airtight plastic bags by the factory can be used. <br /> Decontamination rinsate will be collected and stored properly for future disposal by the client, <br /> ' unless other arrangements have been made. <br /> 1 <br /> INSTALLATION AND DESTRUCTION OF WELLS Page 6 of 8 <br /> ' MSCTR0T04W.TXT REVISION DATE:MARCH 1996 IW-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.