Laserfiche WebLink
' GEOMATRIX <br /> 2.2 SAMPLE CONTAINERS AND PRESERVATION <br /> Appropriate pre-cleaned sample containers and preservatives for the analyses to be performed <br /> ' will be obtained from the subcontracted analytical laboratory. Frequently requested analyses <br /> ' and sample handling requirements are listed in Table 1. <br /> ' 2.3 SAMPLE LABELING <br /> Sample containers will be labeled before or immediately after sampling with self-adhesive tags <br /> ' having the following information written in waterproof ink: <br /> ' Geomatrix <br /> • Project number <br /> ' Sample I.D. number <br /> • Date and time sample was collected <br /> • Initials of sample collector <br /> ' 2.4 QUALITY CONTROL SAMPLES <br /> ' In order to evaluate the precision and accuracy of analytical data, quality control samples, such <br /> as duplicates and blanks, will be periodically prepared. These samples will be collected or <br /> tprepared and analyzed by the laboratory, as specified in the project Quality Assurance Project <br /> Plan (QAPP) or by the project manager. <br /> 2.5 HANDLING, STORAGE, AND TRANSPORTATION <br /> ' Efforts will be made to handle, store, and transport supplies and samples safely. Exposure to <br /> ' dust, direct sunlight, high temperature, adverse weather conditions, and possible <br /> contamination will be avoided. Immediately following collection, samples will be placed in a <br /> ' clean chest that contains ice or blue ice (if cooling is required), and will be transported to the <br /> subcontracted laboratory as soon as practical, or in accordance with the project QAPP. <br /> ' SAMPLING OF GROUNDWATER MONITORING WELLS <br /> AND WATER SUPPLY WELLS Pase:of 10 <br /> ' MSC'PROTO-MW.T'<T REVISION DATE:MARCH 1996 �114W <br />