Laserfiche WebLink
' 0 <br /> ' electrodes, and SEC probes that will be used repeatedly will be cleaned before and after GEOMATRIX <br /> sampling each well and at any time during sampling if the object comes in contact with foreign <br /> ' matter. <br /> Purged waters and solutions resulting from cleaning of purging or sampling equipment will be <br /> ' collected and stored properly for future disposal by the client, unless other arrangements have <br /> been made. <br /> ' Cleaning of reusable equipment that is not dedicated to a particular well will consist of the <br /> 1 following: <br /> ' Bailers - the inside and outside of bailers will be cleaned in a solution of laboratory- <br /> grade detergent and potable water, followed by a rinse with deicnized (DI) water. <br /> ' They may also be steam-cleaned, followed by a DI water rinse. If samples are to be <br /> collected for metals analysis, the Teflon* bailer may be rinsed with a pH2 nitric acid <br /> solution followed by a double DI rinse. <br /> • Purge Pumps - All downhole, reusable portions of purge pumps will be steam- <br /> cleaned on the outside. If the pump does not have a backflow check valve, the inside <br /> of the pump and tubing also should be steam-cleaned. For a purge pump with a <br /> backflow check valve, the interior of the pump and tubing may be cleaned by pumping <br /> a laboratory-grade detergent and potable water solution through the system followed <br /> ' by a potable water rinse, or by steam-cleaning. <br /> ' Water Quality Meters -All meters will be cleaned by rinsing the probe portions in DI <br /> water, and allowing to air dry. <br /> ' Bailer Tripod- The tripod cable will be steam-cleaned or rinsed with DI water. <br /> ' Sample bottles and bottle caps will be cleaned by the subcontracted laboratory using standard <br /> EPA-approved protocols. Sample bottles and bottle caps will be protected from contact with <br /> ' solvents, dust, or other contamination. Sample bottles will not be reused. <br /> 6.0 REFERENCES <br /> SAMPLING OF GROWN DWATER MONITORING WELLS <br /> AND WATER SUPPLY WELLS Pae_e 9 of 10 <br /> ' MSC'PROTO-:NIW.TXT REVISION DAMMARCH IQo6 MW-9 <br />