My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
2245
>
2900 - Site Mitigation Program
>
PR0518127
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 11:46:00 AM
Creation date
5/17/2019 11:33:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0518127
PE
2950
FACILITY_ID
FA0013712
FACILITY_NAME
RAYMOND INVESTMENT CORPORATION
STREET_NUMBER
2245
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16336017
CURRENT_STATUS
01
SITE_LOCATION
2245 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2245 West Charter Way,Stockton <br /> Workplan for Additional Environmental Sampling <br /> August 7,2013 <br /> • Each soil core section(including plastic liner)selected for chemical analyses will be immediately separated <br /> from the total core. The liner containing the selected core will be capped at each end with Teflon® <br /> sheeting, followed by a tight-fitting plastic cap that will be wrapped in tape. Each sample will then be <br /> labeled, logged onto a Chain-of-Custody and placed in an iced cooler for transport to the analytical <br /> laboratory; and <br /> • All borings will be backfilled by free falling neat cement grout after collection of the bottom soil sample or <br /> grab-groundwater sample. <br /> Grab-Groundwater Sampling Protocol <br /> Grab-groundwater samples will be collected at borings B21,B22,B23,B25 and B27. After a boring is advanced to <br /> the desired depth, the drill rod will be removed from the boring. A temporary one-inch diameter well casing will <br /> then placed to the bottom of the boring. After the casing is in place, a '%-inch diameter disposable bailer will be <br /> lowered to the bottom of the temporary well casing to obtain the grab-groundwater sample. The grab-groundwater <br /> sample will then be decanted into the appropriate laboratory provided containers. This process will be repeated at <br /> the other four borings. <br /> Each grab-groundwater sample will be labeled, logged onto a Chain-of-Custody and placed in an iced cooler for <br /> transport to the analytical laboratory. <br /> Disposal of Investigative-Derived Waste <br /> Drill cuttings are not generated during this investigation as drilling will be performed using a direct push rig. <br /> Plastic/acrylic liner debris will be hand cleaned and disposed of as construction debris. Drilling decontamination <br /> water will be contained in a 55-gallon drum and will be transported for recycling. <br /> ANALYTICAL SERVICES <br /> Select soil and up to five grab-groundwater samples will be chemically analyzed at SunStar Laboratories (State <br /> DHS ELAP-Certification#2250)for nitrate as N,ammonia and TKN using the following test methods: <br /> • Nitrate as N(EPA Method 300.0); <br /> • Ammonia(EPA Method 350.3);and <br /> • TKN(EPA Method 351.2) <br /> SCHEDULE <br /> Commencement of the project will begin once an inspection is scheduled with SJCEHD. <br /> Should you have any questions regarding this submittal,do not hesitate to call the undersigned at 310-854-6300. <br /> Respectfully Submitted, S�ONAL G,4-,_ 9 �. MAq (O <br /> O e� r9`PyCP <br /> 1B, a m No. 8356 <br /> Brian Martasin,P.G.#8356 EXP 3 <br /> 0 Q <br /> Principal Geologist q P= <br /> TFOF CATV <br /> Attachments: <br /> ANDERSEN Page 3of 4 <br /> ENVIRONMENTAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.