My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
16
>
2900 - Site Mitigation Program
>
PR0522479
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 2:14:40 PM
Creation date
5/17/2019 2:01:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0522479
PE
2957
FACILITY_ID
FA0015299
FACILITY_NAME
GEWEKE LAND DEVELOPMENT & MARKETING
STREET_NUMBER
16
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04323013
CURRENT_STATUS
01
SITE_LOCATION
16 S CHEROKEE LN
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
568
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REVISED MONITORING AND REPORTING PROGRAM NO. 93-701 -4- <br /> GEWEKE LAND DEVELOPMENT AND MARKETING <br /> SAN JOAQUIN COUNTY <br /> (b) groundwater contour maps and contaminant concentration maps containing all data obtained <br /> during the previous year; <br /> (c) a discussion of the long-term trends in the concentrations of the pollutants in the <br /> groundwater monitoring wells; <br /> (d) an analysis of whether the contaminant plume is being captured by an extraction system or <br /> is continuing to spread; <br /> (e) a description of all remedial activities conducted during the year, an analysis of their <br /> effectiveness in removing the contaminants, and plans to improve remediation system <br /> effectiveness; <br /> (f) the anticipated date for completion of cleanup activities; <br /> (g) an identification of any data gaps and potential deficiencies/redundancies in the monitoring <br /> system or reporting program; <br /> (h) if desired, a proposal and rationale for any revisions to the groundwater sampling plan <br /> frequency and/or list of analytes. <br /> The results of any monitoring done more frequently than required at the locations specified in the <br /> MRP also shall be reported to the Board. The Discharger shall implement the above monitoring <br /> program as of the date of the Order. <br /> Ordered by: <br /> 0"VM TON, Executive Officer <br /> (Date) <br />
The URL can be used to link to this page
Your browser does not support the video tag.