Laserfiche WebLink
Prsall <br /> arch <br /> Page • <br /> age 220 <br /> 4. <br /> Page ES-4, Section ES-4.1.4; <br /> detections from the In the re <br /> Central Brea. newly installed port' Please <br /> 528 cluster located <br /> discuss the recent TCE <br /> 5, to ES-6, section E west of the <br /> the recent d cto ' 5.5.1'1 last s <br /> installed MW5 t- of T sentence; plea <br /> iPWJ <br /> installed <br /> 26 cluster Of E at a cOncentrat onse revise the I <br /> almost Historically, mately 650 fee Of last sentence <br /> in the last decade. PW 010 has had t upgrade"t fr found in the due <br /> MW526 change Please disc T the Elections t from Potable newly <br /> nge the conceptual uss, in at the re well <br /> General C site model. report' how the deporting limit for <br /> omment(s); tections of TC <br /> 1, E <br /> Recently, D7-SC assisted DDJ <br /> calibration of C/Defense <br /> was intend a steady-state ground LO is <br /> ed to be water g 11Cs ggency in its <br /> in order to het used as a tool d model for pp J develo <br /> Part of the Re P develop a /on both Predict C-Sharpe e Pment and <br /> developmentPonse Co 9-term remedial and interpret he model <br /> of the mPletion Plan strategy for response water <br /> version of the model and whether i Please discuss, Ponse actio data <br /> Annual Ground W will be subd the re ns as <br /> If you have Water Monitorin mltted t Of the <br /> me at any questions g/Pr°9ress as part °f the final <br /> (916) 255-3713 °r Comments re Report. <br /> or e-mail me at ma regarding g this letter, please f <br /> Sincerely, dtsc.ca. Ov eel free to cont ct <br /> X- 2a <br /> Peter MacNicholl, P-E. <br /> Remedial Project Manager <br /> Office of Military Facilities <br /> cc: See DDJC-Sharp Distribution List. <br />